The project involves the renovation of the irrigation system at the Nashville National Cemetery. The contractor will be responsible for replacing and repairing various components of the irrigation system, including the controller, 2-wire control wiring, decoders, valves, sprinklers, laterals, and selected mainline repairs/replacements. The contractor will also be required to perform hydrostatic/pressure testing of the existing mainline. The project requires the contractor to field verify any conditions visible during the site visit and base their pricing strictly on the quantities and repair scope stated within the Statement of Work (SOW).
• The project is located in Tennessee, but the contractor does not need a Florida contractor license.
• The existing irrigation pump house has a cracked pump that needs to be replaced.
• The contractor should not include additional allowance for unknown defective existing piping and components in their base bid.
• The bid should reflect only the approximate mainline repair quantities as stated in the SOW.
• The contractor will be responsible for locating existing sleeves under roads and hardscape.