The Grand River Dam Authority is soliciting bids to remove two existing transmission‑line foundations located in the Illinois River (Cherokee County, OK) and restore the riverbed to pre‑construction conditions. The work includes cutting foundations to at least one foot below the riverbed, debris removal, implementation of a Stormwater Pollution Prevention Plan (SWPPP), provision of access matting, and compliance with USACE Letter of Permission No. SWT‑2019‑00200. The contractor must supply all labor, equipment, materials, and environmental controls, and must coordinate with GRDA’s construction inspector.
• Mandatory pre‑bid meeting on 04/23/2026 and mandatory site‑visit (scheduled individually beginning 04/27/2026).
• Project window June 10 – December 31 2026; 14‑day written notice required before mobilization.
• Requires OSHA‑30 certification, extensive safety documentation, insurance (CGL $2 M per occurrence, etc.), and submission of detailed technical, experience, and non‑collusion certifications.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.