Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Construction
  5. ›North Village Park - Playground, Surfacing, and Shade

City of Columbia·Missouri

North Village Park - Playground, Surfacing, and Shade

Closes 10/30/2026$250k – $350kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation invites qualified firms to design, engineer, fabricate, deliver, and install a custom interactive playground at North Village Park in Columbia, Missouri, with optional protective surfacing and a shade structure. The City has allocated a total budget of $320,000. Proposals must include 2‑D plans, 3‑D renderings, compliance with ASTM F1487 (playground equipment) and ASTM F1951 (fall surfacing), ADA accessibility, and prevailing‑wage requirements. The contract will be awarded after evaluation of creativity, cost, experience, and warranty, and the work must be completed within 180 calendar days of the notice to proceed. • Scope includes playground design, structural engineering, delivery, and installation of equipment. • Alternate #1 – protective artificial fall surfacing (poured‑in‑place or turf) covering ~5,160 SF. • Alternate #2 – shade canopy with footings, structural posts, cable, canvas sails, and lighting. • Required deliverables: 2‑D plans, 3‑D renderings, sealed bid bond (5 % of bid), performance and labor‑material bonds (100 % of contract price). • Must meet ASTM, CPSC, ADA, and Missouri Prevailing Wage Order No. 33. • Budget: $320,000 (maximum). • Key dates: Pre‑proposal conference – Oct 20, 2026; Questions due – Oct 22, 2026; Proposal deadline – Oct 30, 2026. • Project completion required within 180 days after notice to proceed; liquidated damages $250 per day for overruns.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brittany Miller(Procurement Officer)

[email protected]

(573) 874-7687

Key dates

Opened
10/9/2026
Questions due
10/22/2026
Pre-bid meeting
10/20/2026
Closes
10/30/2026
Duration
180 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238990
Solicitation №
86/2026

Budget estimate

$250,000 – $350,000

The City of Columbia has earmarked $320,000 for the entire scope (design, engineering, materials, installation, and two optional alternates). Assuming typical profit margins of 10‑15 % for specialty contractors and accounting for bond, labor‑wage, and material costs, the net earnings for the winning firm are likely to fall between roughly $250,000 and $350,000. The lower bound reflects a tight bid that only covers base playground installation; the upper bound assumes the firm also wins both alternates (surfacing and shade) and achieves a modest profit margin. Factors influencing the final budget include the chosen alternates, any change orders, and the firm’s ability to manage labor‑material costs within the prevailing‑wage framework.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Cleveland, Georgia·Georgia

Top match · 69%

RFP Playground Equipment, Safety Surfaces, Delivery and Installation

Closes 11/20/2026Opened 10/19/2026

Georgia Richmond County Board of Education·Georgia

67% match

FREEDOM PARK PLAYGROUND EQUIPMENT & POURED RUBBER SAFETY SURFACING; RFP#26-216

Closes 11/9/2026Opened 10/12/2026

Pierce County·Washington

66% match

Gonyea Playfield

Closes 11/18/2026Opened 10/16/2026

City of Delphos·Kansas

66% match

A Place To Play - Park Improvements - Delphos, KS

Closes 11/2/2026Opened 9/28/2026

City of Appleton·Wisconsin

66% match

Colony Oaks Park Playground

Closes 11/20/2026Opened 10/20/2026

City of Lauderhill·Florida

66% match

GO BOND PROJECT: MUNICIPAL PARKS PLAYGROUND REPLACEMENT - CITY OF LAUDERHILL PARKS

Closes 11/9/2026Opened 10/2/2026

Massachusetts City of Boston·Massachusetts

66% match

RFQ - IMPROVEMENTS TO CHRISTOPHER LEE PLAYGROUND

Closes 11/3/2026Opened 10/19/2026

Village of Biscayne Park·Florida

66% match

Village Comprehensive Youth Program Services

Closes 11/4/2026Opened 10/21/2026

City of Encinitas / San Dieguito Water·California

66% match

Park Equipment Replacement at Wiro and Orpheus Parks

Closes 11/12/2026Opened 10/15/2026

Camden County·New Jersey

66% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

City of Lauderhill·Florida

65% match

GO BOND PROJECT: MUNICIPAL PARKS PLAYGROUND REPLACEMENT - CITY OF LAUDERHILL PARKS

Closes 11/9/2026Opened 10/2/2026

Connecticut City of Stamford·Connecticut

65% match

City RFP - Design Services for Northrop Park Improvements

Closes 11/5/2026Opened 10/8/2026

NYS Union Springs, Village of·New York

65% match

For Design, Engineering and Construction of Improvements to Frontenac Park

Closes 11/30/2026Opened 9/14/2026

Georgia City of Sandy Springs·Georgia

65% match

27-010 Ridgeview Park Improvements

Closes 11/6/2026Opened 9/29/2026

City of Northfield·Minnesota

65% match

Northfield, City of Skateboard Park Phase 2 26X.143028

Closes 11/4/2026Opened 10/16/2026

City of Manchester·New Hampshire

65% match

Parks: Manchester Skate Park & Harvell St. Improvement

Closes 11/19/2026Opened 10/9/2026

Pierce County·Washington

65% match

Orangegate Park Phase 1 Site Improvements

Closes 11/10/2026Opened 10/7/2026

Monroe County·New York

64% match

Children's Pavilion at Highland Park

Closes 12/2/2026Opened 10/31/2026

Kansas Department of Wildlife and Parks·Kansas

64% match

Playground Surface Material

Closes 12/2/2026Opened 10/26/2026

Boston Public Schools·Massachusetts

64% match

Playground Surface Replacement

Closes 11/12/2026Opened 10/28/2026

City of Madison·Wisconsin

64% match

Northeast Park Athletic Complex

Closes 11/6/2026Opened 8/5/2026

Allied States Cooperative by ESC 19·Texas

64% match

Playground/Park Systems and Installation - ESC Region 19 Allied States Cooperative

Closes 11/10/2026Opened 10/8/2026