The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the design-build of Retamal Dam Emergency Generator and Building. The emergency generator at Retamal Dam is no longer working and replacement is necessary. The new generator will be housed in a metal building installed on a new concrete pad with a modern diesel fuel tank. The construction includes site preparation, inspection of all systems and structures, disposal of debris and construction waste, and quality control testing.
• The working hours of the USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday.
• The Contractor and any subcontractors shall only work on site during these proposed hours.
• USIBWC facilities, including the dam, are closed during all federal Holidays.
• Workers must pass through USIBWC levees to access Retamal Dam.
• Border Patrol is present in the area, and the Contractor and subcontractor shall have identifying vehicles when working in the area.
• The US Fish and Wildlife own land adjacent to Retamal Dam, and the Contractor shall stay clear of US Fish and Wildlife property.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.