Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wisconsin
  4. ›Construction
  5. ›West Badger Mill Greenway Improvements – Contract No. 9588

City of Madison·Wisconsin

West Badger Mill Greenway Improvements – Contract No. 9588

Closes 6/25/2026$400k – $600kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Madison is soliciting bids for the West Badger Mill Greenway Improvements, a multi‑disciplinary civil‑construction project that includes extensive earthwork, storm‑sewer installation, erosion‑control measures, and ecological restoration of a greenway corridor in Madison, WI. The scope covers removal of approx. 5,300 cubic yards of soil, installation of a 6′ × 6′ catch basin with sump, a 4′ SAS, new RCP storm‑sewer pipe, placement of riprap, erosion‑control fabrics, native seeding, plug planting, and invasive‑species management. Bids must be submitted electronically via BidExpress (or by hand) by the deadline, with a mandatory 5 % bid bond and Small‑Business Enterprise (SBE) participation goals. • Earthwork & grading (≈ 5,225 CY excavation, top‑soil placement, riprap, filter fabric). • Storm‑sewer construction (new 12‑in & 21‑in RCP pipe, catch basin, SAS, utility line openings). • Erosion‑control & habitat restoration (erosion‑mat, silt socks, native seed mix, vegetative mat, invasive‑species removal). • Compliance requirements: 5 % bid bond, SBE goal 15 %, digital ID for electronic bidding, mandatory pre‑bid virtual meeting, and numerous permits (WDNR, USACE, city erosion‑control).

Attached files

Contact

Sarah Lerner(Project Manager)

[email protected]

(608) 261-8592

Key dates

Opened
6/11/2026
Pre-bid meeting
6/18/2026
Closes
6/25/2026
Duration
18 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237130
Solicitation №
9588 - Wester Badger Mill Greenway Improvements

Budget estimate

$400,000 – $600,000

The engineered estimate for the project is $465,000. Assuming typical public‑works markup and potential cost overruns, the awarded contract is likely to range between $400 K and $600 K. This range reflects the combined civil‑construction, utility‑installation, and ecological‑restoration components, plus the required bid‑bond and SBE compliance overhead.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Illinois Tollway·Illinois

Top match · 72%

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

71% match

Rockwood Hall Entrance at Rockwood Hall of Rockefeller State Park Preserve

Closes 11/19/2026Opened 10/15/2026

City of Madison·Wisconsin

71% match

SAUK CREEK GREENWAY

Closes 1/28/2027Opened 1/28/2027

Town of Camp Verde·Arizona

71% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

City of Madison·Wisconsin

71% match

Madison LakeWay – Skyline Improvements (Contract 9801)

Closes 12/17/2026Opened 10/1/2026

Massachusetts City of Springfield·Massachusetts

71% match

27-059: Improvements to Forest Park Fitness Course

Closes 11/12/2026Opened 10/21/2026

Villages Community Development Districts, FL·Florida

71% match

Executive Golf Course Renovation Projects – Various Locations

Closes 11/3/2026Opened 10/9/2026

City of Madison·Wisconsin

71% match

Castle Creek Channel Improvements at Warner Park

Closes 11/5/2026Opened 10/23/2026

Kenosha County·Wisconsin

70% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Green Bay·Wisconsin

70% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Mississippi Department of Finance and Administration·Mississippi

70% match

Road Improvements (GS# 633-003)

Closes 11/19/2026Opened 10/20/2026

Municipality of Skagway·Alaska

70% match

West Creek Levee Improvements

Closes 11/9/2026Opened 10/12/2026

Pennsylvania Game Commission·Pennsylvania

70% match

23SW SGL285 Watts Mill and Cannelton Rd

Closes 11/3/2026Opened 9/29/2026

Maryland State Highway Administration·Maryland

70% match

AL5105179 - MD 736 (Braddock Road) from Park Avenue to Braddock Street Sidewalks

Closes 12/3/2026Opened 10/27/2026

Town of Upton·Wyoming

70% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

City of Lowell·Massachusetts

70% match

Appleton Church Streets Project

Closes 11/24/2026Opened 10/28/2026

Bluewing Civil Consultants, LLC.·Louisiana

70% match

West Interstate Dr. and Walmart Dr. Roadway Improvements – Project No. 226011

Closes 11/9/2026Opened 10/14/2026

Loudoun County·Virginia

70% match

Construction of the Westpark Improvements, RFQ 692007

Closes 11/5/2026Opened 9/23/2026

Massachusetts Town of Westborough·Massachusetts

70% match

FY2027-001 Golf Course Maintenance Services

Closes 12/1/2026Opened 10/26/2026

Ohio City of Westerville·Ohio

70% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

City of Madison·Wisconsin

70% match

Old Middleton Road Underpass of WSOR Railroad / Troy Drive Underpass / University Crossing Underpass of WSOR railroad

Closes 12/17/2026Opened 9/18/2026

Springfield·Massachusetts

70% match

27-059 - Improvements to Forest Park Fitness Course

Closes 11/12/2026Opened 10/21/2026

Connecticut Town of Bloomfield·Connecticut

69% match

RFP 1175 Wintonbury Hill Golf Course - Bunker, Green & Tee Renovations

Closes 11/5/2026Opened 10/6/2026

City of Santa Barbara·California

69% match

Golf Club Green and Tee Box Renovation

Closes 11/9/2026Opened 10/16/2026

Massachusetts City of Lowell·Massachusetts

69% match

Appleton Church Streets Project

Closes 11/24/2026Opened 10/28/2026