Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›Fairington Road Sidewalk Project

Georgia City of Stonecrest·Georgia

Fairington Road Sidewalk Project

Closes 11/12/2025$500k – $2MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Stonecrest is seeking qualified and experienced bidders to respond to a fixed (one-time) project for the construction of sidewalks on Fairington Road. The project includes the construction of a section of sidewalk at a single location within the limits of the City of Stonecrest, Georgia. The Contractor shall furnish all labor, materials, equipment, personnel, tools, supervision, transportation, machinery, and other incidentals necessary to perform the work requested herein and typical of these types of projects. Key responsibilities include: • Constructing a +/- 2,286 LF 5 ft. wide and 4 in. thick sidewalk on the south side of Fairington Road • Installing storm drainage and maintaining storm drain inlet and outlet protection measures • Implementing erosion control measures and maintaining sediment and erosion control features throughout the life of the project • Restoring all trees, shrubbery, and sodding if all areas disturbed while performing the work • Providing a detailed bi-weekly work plan of project activities • Obtaining all required state, federal, and local permits and licenses • Maintaining insurance coverage as specified in the contract The bid price should include all costs associated with the project, including labor, materials, equipment, and permits. The City of Stonecrest will provide a GDOT Encroachment Permit, and the Contractor shall be responsible for obtaining all other necessary permits and licenses.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Tanisha Boynton(Procurement Official)

[email protected]

(678) 672-8637

Key dates

Opened
9/30/2025
Questions due
10/24/2025
Pre-bid meeting
10/14/2025
Closes
11/12/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
CITB-0014-25 REBID

Budget estimate

$500,000 – $2,000,000

Based on the scope of work, the estimated budget for this project could be in the range of $500,000 to $2,000,000. This estimate is influenced by the length of the sidewalk, the materials required, and the labor costs associated with the project. The City of Stonecrest has a budget for the project, but the exact amount is not specified in the document.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 72%

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

Central Midlands Council of Governments·South Carolina

72% match

Sidewalk Additions along Drayton Street, Park Street, Vanderhorst Street, and Chalmers Street

Closes 11/5/2026Opened 10/2/2026

City of Charlotte·North Carolina

71% match

Robinson Church Road Sidewalk, Brawley Lane to Jones Creek Lane

Rolling / TBD closeOpened 3/11/2026

Connecticut Town of Voluntown·Connecticut

71% match

Shetucket Tpke & Beach Pond Sidewalk Construction

Closes 11/13/2026Opened 10/8/2026

Richland County·South Carolina

70% match

Friarsgate Boulevard Sidewalk Project

Closes 8/28/2027Opened 7/28/2026

Charleston County·South Carolina

70% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

City of Fort Wayne·Indiana

69% match

0482S - St. Joe Center Road Sidewalk Extension

Closes 11/12/2026Opened 10/29/2026

Georgia City of Sandy Springs·Georgia

69% match

Dunwoody Road Gap Fill Sidewalk T6026-2

Closes 11/13/2026Opened 10/13/2026

City of Portland·Maine

69% match

2026 Forest Avenue Sidewalk Project (PDF, 88.12 KB)

Closes 11/4/2026Opened 10/9/2026

Maryland Carroll County Government - Procurement·Maryland

69% match

ldersburg Area Sidewalk Improvements

Closes 11/18/2026Opened 10/23/2026

County of DeKalb, GA·Georgia

69% match

Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

North Carolina Town of Knightdale·North Carolina

69% match

Old Knight Road Sidewalk Improvement Project

Closes 11/3/2026Opened 9/18/2026

Connecticut Town of Hamden·Connecticut

69% match

Hamden Walkable Sidewalks DOT 61-153

Closes 12/10/2026Opened 10/27/2026

Georgia Laurens County Board of Commissioners·Georgia

68% match

City of Cadwell Sidewalk Project

Closes 11/4/2026Opened 10/14/2026

Connecticut Town of Hamden·Connecticut

68% match

Hamden Walkable Sidewalks DOT 61-153

Closes 12/10/2026Opened 10/27/2026

NYS Rochester, City of·New York

68% match

HAZARDOUS SIDEWALK REPLACEMENT PROGRAM - NORTHEAST QUADRANT CONTRACT 2027 PHASE 4

Closes 11/17/2026Opened 10/26/2026

City of Fairlawn·Ohio

68% match

Smith Road SRTS – Fairlawn (PID 120279)

Closes 11/9/2026Opened 10/16/2026

Georgia City of Swainsboro·Georgia

67% match

City of Swainsboro, Georgia: North Green Street Sidewalk Improvements

Closes 12/3/2026Opened 10/30/2026

Ohio City of Westerville·Ohio

67% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

City of Harrisonburg·Virginia

67% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

County of DeKalb, GA·Georgia

67% match

Snapfinger Woods Sidewalk Construction with Pedestrian Hybrid Beacon (12 Months)

Closes 11/12/2026Opened 9/28/2026

City of Ormond Beach - Purchasing Office·Florida

67% match

2027 Sidewalk Repair and Replacement

Closes 11/18/2026Opened 10/11/2026

City of Fayetteville·North Carolina

67% match

ITB-Breezewood Avenue Sidewalk Improvements

Closes 11/12/2026Opened 10/5/2026

Missouri Department of Transportation·Missouri

67% match

NW District, City of Bethany, Constructing South Harrison R2 pool sidewalk project

Closes 11/19/2026Opened 10/19/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

67% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT

Closes 11/17/2026Opened 10/14/2026