Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›OMH Hutchings Psychiatric Center Roof Replacement &…

Dormitory Authority of the State of New York·New York

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Materials Abatement Buildings 6, 11, 15, 17 – Phase 1 (EOI)

Closes 9/2/2026$1.8M – $2.2MRequest for Expression of InterestLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Materials Abatement Buildings 6, 11, 15, 17 – Phase 1 (EOI) THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLY See the Eligibility Requirements further down in this document. DASNY is soliciting bids for the removal of existing roofing material and installation of a new roofing system with asbestos and hazardous materials abatement project at Buildings 6 and 11 of Hutchings Psychiatric Center, located at 620 Madison Street, Syracuse, New York. The purpose of this project is to remove the old existing roofing material and replace with a new TPO roofing system. The GC Contract includes temporary facility controls, site preparation, selective demo, new roofing system materials & installation and asbestos & hazardous material abatement. The estimated cost range for scope of work is between $1,800,000 and $2,200,000. Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice. Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid. Please find links to the specifications and drawings below: Project Manual Drawings General Conditions for Construction dated February 4, 2026, will apply to the Contract Documents. The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows: Percent of Total Work Force (EEO): Minority & Women Workforce Goal (for all trades) 10% Percent of Total Contract (M/WBE): Minority Business Enterprise Goal 18% Women's Business Enterprise Goal 12% Service-Disabled Veteran Owned Businesses 6% Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid. Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to [email protected]. Instructions for Submission of the EOI Packages: Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection. Each package shall be submitted with: A Cover Page that clearly identifies: The Legal Name of the Company submitting the EOI The Project Name for which the EOI is being submitted The Date of Submission Immediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number. The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation. All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation. Tabs must be in the following sequence: Tab 1 – Company Profile Provide a company profile that includes the following information: Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project. Date Established – When the company was founded. Company Address – Primary business location. Ownership Information – Name and resumes of all principal owners. Client List – Summary of public and private sector clients. Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers. Equipment - Overview of all equipment owned by the company. Self-Performed Services - Description of all services the company performs directly (not subcontracted). MWBE and SDVOB Certifications – Provide a copy of the company’s MWBE and/or SDVOB certifications (if applicable). Tab 2 –Experience Provide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed. Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years. For each project, include the following information: Name of the project designer Firm name and contact information Project title and location/facility Brief description of the project Total construction cost Construction start date Substantial completion date Indicate role as prime contractor or subcontractor Percentage of the work that was self-performed If applicable, also include a list of all DASNY projects completed within the last 5 years. Tab 3 – Project Schedules Provide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project. Tab 4 – Safety Program Provide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety. Tab 5 – Résumés Provide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative. Tab 6 – Potential Subcontractors Provide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work. Tab 7 – Anticipated Workload Provide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe. Tab 8 – Experience Modification Rating Provide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation. Tab 9 – Bonding Capacity Provide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements. Tab 10 – NYS Vendor Responsibility Questionnaire Provide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy. Eligibility/Qualifications Requirements/Preferences: Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY. Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details. In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and [email protected]. Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website (www.dasny.org) for Authority policy and procedures regarding this law, or the OGS website (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michael Gleason(Project Manager)

[email protected]

(518) 807-7812

Key dates

Opened
8/7/2026
Closes
9/2/2026

Last updated

Details

Type
Request for Expression of Interest
Industry
Construction
NAICS
236220
Solicitation №
2137838

Budget estimate

$1,800,000 – $2,200,000

The estimated cost range for the scope of work is between $1,800,000 and $2,200,000. This range is likely to be the budget amount, as it reflects the total cost of the project. The actual budget may vary depending on the final contract terms and the selected contractor's bid. Factors that may influence the likely payment range include the complexity of the project, the number of bidders, and the availability of funding.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS Titan Roofing, Inc.·New York

Top match · 82%

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Material Abatement Buildings 6, and 11 (Phase 1 – Buildings 6 and 11)

Closes 11/5/2026Opened 10/7/2026

Dormitory Authority of the State of New York·New York

79% match

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Material Abatement Buildings 6, and 11 (Phase 1 – Buildings 6 and 11)

Closes 11/5/2026Opened 9/25/2026

Dormitory Authority of the State of New York·New York

75% match

OASAS C.K. Post Addiction Treatment Center No. 854 Roof Replacement and Asbestos and HAZMAT Abatement - Project No. 388420

Closes 11/18/2026Opened 10/21/2026

Dormitory Authority of the State of New York·New York

75% match

OASAS C.K. Post Addiction Treatment Center No. 854 Roof Replacement and Asbestos and HAZMAT Abatement

Closes 11/18/2026Opened 10/21/2026

Dormitory Authority of the State of New York·New York

75% match

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Material Abatement Buildings 6, and 11 (Phase 1 – Buildings 6 and 11)

Closes 11/5/2026Opened 9/25/2026

City of Ontario·California

73% match

FM26-001 Chaffey Community Museum of Art Roof Replacement

Closes 11/10/2026Opened 10/8/2026

City of Worcester·Massachusetts

73% match

Roof Replacement - 76 East Worcester St / DPW

Closes 11/13/2026Opened 9/24/2026

New Jersey Division of Property Management and Construction (NJ DPMC)·New Jersey

73% match

Roof Replacement for Outer Housing Units

Closes 11/10/2026Opened 9/29/2026

City of Chino·California

73% match

IB278, PF264, PF270 - MULTIPLE FACILITIES ROOF REPLACEMENT PROJECT

Closes 11/17/2026Opened 10/8/2026

Northeast Wisconsin Technical College·Wisconsin

73% match

Aurora Roof Replacement

Closes 11/10/2026Opened 10/19/2026

Dormitory Authority of the State of New York·New York

72% match

OMH Hutchings Psychiatric Center Replace Boilers in Buildings 16 & 17 including Asbestos and Hazardous Materials Abatement

Closes 11/19/2026Opened 10/14/2026

New Jersey Division of Property Management and Construction (NJ DPMC)·New Jersey

72% match

Project: AFKC-STU-Annex Roof Replacement - Ann Klein Forensic Center – Special Treatment Unit Annex

Closes 12/15/2026Opened 10/28/2026

Illinois SOS - Secretary of State·Illinois

72% match

INDEX ROOF FLUID APPLIED ROOF

Closes 11/19/2026Opened 10/28/2026

NYS OGS Design & Construction - Construction Contractors·New York

72% match

Replace Roof & Associated Mechanicals

Closes 11/18/2026Opened 10/13/2026

NYS State University Construction Fund·New York

72% match

Replace Roofs - Various Buildings

Closes 11/10/2026Opened 10/16/2026

U.S. Postal Service·Colorado

71% match

Denver, CO Denver P&DC Roof Replacement K95856

Closes 11/20/2026Opened 10/19/2026

Dormitory Authority of the State of New York·New York

71% match

OMH Hutchings Psychiatric Center Replace Boilers in Buildings 16 & 17 including Asbestos and Hazardous Materials Abatement

Closes 11/19/2026Opened 10/14/2026

Illinois DHS - Human Services·Illinois

71% match

DHS IFB CMHC Unit F Flooring Tile Abatement & Refinishing

Closes 11/6/2026Opened 10/14/2026

Northeast Ohio Medical University·Ohio

71% match

Roof Replacement 26, 27, 35, and 37

Closes 11/4/2026Opened 10/7/2026

Dept of Natural Resources·Wisconsin

71% match

Roof Replacement

Closes 11/5/2026Opened 10/14/2026

Marinette County·Wisconsin

71% match

RFB #26-015-34 - Law Enforcement Center Roof Replacement

Closes 11/16/2026Opened 9/29/2026

State of Delaware DSHA·Delaware

71% match

Roofing Replacement at Burton Village

Closes 11/10/2026Opened 10/19/2026

NYS OGS Design & Construction - Construction Contractors·New York

71% match

45298 HVAC – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

Ohio Department of Rehabilitation and Correction·Ohio

71% match

McKinley Ave Roof-DRC270104-714

Closes 11/4/2026Opened 10/20/2026

NYS OGS Design & Construction - Construction Contractors·New York

71% match

Replace Roof & Associated Mechanicals – Troop F Headquarters (Project No. 47971)

Closes 11/18/2026Opened 10/13/2026