Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Virginia guideVirginia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Virginia
  4. ›Construction
  5. ›Exterior Deck Covering Solutions for Nauticus Marina Pier

City of Norfolk·Virginia

Exterior Deck Covering Solutions for Nauticus Marina Pier

Closes 11/6/2025$50k – $200kRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Norfolk is seeking information regarding exterior deck covering solutions for the existing Nauticus Marina Pier wood timber decking. The City is looking for a safe, durable, and weather-resistant covering that can be installed over the existing timber decking and withstand consistent pedestrian and cruise luggage cart traffic. The covering should be weatherproof, slip-resistant, and child-friendly, and should be able to be removed and/or replaced as necessary without major disruption. The City intends to use this information to evaluate potential solutions and determine whether a competitive solicitation should follow. Some of the key considerations for the covering include: • Compatibility with existing wood timber decking • Durability and safety features • Maintenance and replaceability requirements • Cost range and estimated product lifespan • Case studies of similar installations in maritime environments The City welcomes responses that include answers to all or any of the above questions.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Krystyna Owen(Purchasing Agent)

[email protected]

(757) 404-5101

Key dates

Opened
9/30/2025
Questions due
10/31/2025
Closes
11/6/2025

Last updated

Details

Type
Request for Information
Industry
Construction
NAICS
327999
Solicitation №
10955-0-2026/KJO

Budget estimate

$50,000 – $200,000

The budget for this project is difficult to estimate, as the City is only seeking information at this stage and has not provided a specific budget. However, based on the scope of the project, which includes covering an area of approximately 25’ x 50’, the cost could range from $50,000 to $200,000, depending on the material and installation costs. This estimate is purely speculative and may not reflect the actual cost of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Key West·Florida

Top match · 67%

A-Dock Replacement and D-Dock Decking Replacement Key West Bight Marina

Closes 11/23/2026Opened 10/15/2026

Connecticut Town of Westport·Connecticut

67% match

Compo Marina Piers - Utility Platform

Closes 11/19/2026Opened 10/23/2026

City of Hermosa Beach·California

67% match

CIP 623 - Pier Structural Repairs Project

Closes 11/12/2026Opened 10/15/2026

City of St. Petersburg·Florida

66% match

St. Petersburg Pier Pile Repairs

Closes 11/5/2026Opened 10/27/2026

City of Newport News·Virginia

66% match

Seafood Industrial Park Outer Harbor Pier & Dolphins Restoration

Closes 11/9/2026Opened 10/8/2026

City of Lake Elsinore·California

66% match

Modular Floating Platforms

Closes 12/1/2026Opened 9/23/2026

New York City Department of Parks & Recreation·New York

66% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/2/2026Opened 9/21/2026

City of Marco Island·Florida

65% match

ITB 2026-013 Winterberry & Maple Beach Access Beautification

Closes 11/19/2026Opened 10/18/2026

Town of Highland Beach·Florida

65% match

Marine Access Facility Construction

Closes 11/12/2026Opened 10/9/2026

City of Melbourne·Florida

65% match

Front Street Boat Dock Repair and Replacement

Closes 11/17/2026Opened 10/9/2026

Town of Winthrop·Maine

65% match

Request for Proposals - Pier Removal at Maranacook Lake in Winthrop, Maine

Closes 12/11/2026Opened 9/11/2026

Miami-Dade County·Florida

65% match

Multiple Marina Construction and Repairs - North of Tamiami Trail to the County line

Closes 11/10/2026Opened 10/22/2026

City of La Mesa·California

65% match

La Mesa Police Department Garage Deck Waterproofing

Closes 11/10/2026Opened 10/16/2026

Miami-Dade County·Florida

64% match

Multiple Marina Construction and Repairs - South of SW 120th St to County line

Closes 11/10/2026Opened 10/22/2026

Miami-Dade County·Florida

64% match

Multiple Marina Construction and Repairs - Central of Tamiami Trail to SW 120th Street

Closes 11/10/2026Opened 10/22/2026

Lake Superior State University·Michigan

64% match

Exterior Dock House with Hydraulic Dock Leveler

Closes 11/6/2026Opened 10/28/2026

U.S. Department Of The Interior·Colorado

64% match

LARO 258755 - Replace Dilapidated Docks and Fuel S

Closes 11/10/2026Opened 9/11/2026

Jacksonville Port Authority·Florida

64% match

Repair and Replacement of Four (4) Canopies for Jacksonville Port Authority, Dames Point Cruise Terminal

Rolling / TBD closeOpened 10/6/2026

Village of North Palm Beach·Florida

64% match

Buoy Road Stormwater

Closes 11/10/2026Opened 10/8/2026

City of Newport News·Virginia

63% match

IFB# 27-2089-6256, Seafood Industrial Park Outer Harbor Pier & Dolphins Restoration

Closes 11/2/2026Opened 10/8/2026

City of Daytona Beach·Florida

63% match

2702RFQ - Daytona Beach Replacement Pier Consultant

Closes 11/5/2026Opened 10/8/2026

State University of New York (SUNY)·New York

63% match

Exterior Facade Signage Installation at Baylis Hall

Closes 11/19/2026Opened 10/27/2026

Ohio Department of Natural Resources·Ohio

63% match

Shawnee Marina Seawall Slip

Closes 11/19/2026Opened 10/26/2026