The University of California, Los Angeles is seeking a qualified subcontractor to execute the millwork, solid‑surface countertop, and wood‑wall panel package for the Acosta Operations Center renovation. The scope covers design, fabrication, and installation of interior millwork, solid‑surface countertops, laminate‑faced components, and wood wall panels, as well as associated demolition, finish work, MEP modifications, and broadcast infrastructure upgrades within a 2,738 gsf ground‑floor space. The project is funded at $144,735 (lump‑sum) and requires compliance with LEED‑ID+C, UC Fair Wage, hazard‑material abatement, and restricted‑hour work in an occupied building.
• Scope: Architectural millwork, solid‑surface countertops, wood‑wall panels, demolition, finishes, MEP adjustments, broadcast system integration.
• Requirements: Active CA B‑License or C‑6 License, adherence to UC Fair Wage, LEED‑ID+C, HazMat abatement, and possible night/weekend work.
• Procurement: Bidding documents available Sept 2 2026; pre‑bid conference Sept 8 2026 (Teams); site walk Sept 9 2026; RFI deadline Sept 15 2026; bid deadlines Oct 6, 13, 19 2026 via BuildingConnected.
• Contact: Filiberto Diaz (
[email protected], (213) 407‑2021) for questions.