The City and Borough of Juneau is seeking bids for the reconstruction of Dudley Street from Tongass Boulevard to the east end. The project includes replacement of underground utilities, roadway subbase, asphalt resurfacing, curb and gutter, and sidewalk. The work will be completed in two phases, with a completion date of August 15, 2027.
• Replacement of ductile iron water main and services with high-density polyethylene
• Replacement of 8-inch asbestos cement sanitary sewer main and services with polyvinyl chloride
• Replacement of corrugated metal pipe storm drain system with corrugated polyethylene pipe
• Installation of two streetlights
• Asphalt resurfacing and addition of curb and gutter and sidewalk along the south side and valley gutter along the north side of the roadway