SUMMARY OF WORK The Work of this project includes furnishing all labor, materials, appliances, tools, equipment and plant, and performing all Work in accordance with these specifications and drawings, with exception of work that is expressly and specifically not included in the project. The project consists of one (1) contract. Work shall include, but not be limited to: i. Furnish and install erosion and sediment control measures, including silt sock and concrete washout area, as required for station improvements. ii. Excavate for new concrete pads, footings, and foundations, including backfill, compaction, and disposal of spoils. iii. Furnish and install concrete foundations, piers, walls, and slab‑on‑grade for the station shelter, including all reinforcement. iv. Furnish and erect structural steel, including columns, beams, plates, purlins, and metal roof decking. v. Furnish and install architectural station components, including curved standing‑seam metal roof, impact‑resistant aluminum façade panels, composite soffits/fascia, laminated glass windscreens, and related joint sealants. vi. Furnish and install site furnishings, including floor mounted bench and blast‑resistant trash receptacles. vii. Furnish and install electrical systems for the station, including lighting, conduit and wiring, radiant heaters, panelboard and feeders, grounding, and penetrations/restoration. Refer to the Project Manual and Contract Drawings for further information