The City of Duluth and Duluth Airport Authority are seeking qualified contractors to replace and relocate the fuel farm at Sky Harbor Airport (DYT). The scope includes demolition of the existing 5,200‑gal AVGAS tank, concrete pad, and associated equipment; installation of a new above‑ground storage tank, sub‑mersible pump, aviation‑style dispensing cabinet with integrated hose reel, filtration, metering, underground piping, transition sumps, upgraded signage, collision‑protection bollards, and reinforced concrete foundations. The project also requires extensive civil works (excavation, grading, silt‑fence, topsoil, turf restoration, and pavement repair), electrical power and control installation (new conduit, panels, explosion‑proof fittings, lighting, and data cabling), compliance with Minnesota prevailing‑wage statutes, FAA and NFPA standards, and submission of required bonds, insurance, and certifications. |
• Demolition of existing fuel‑system infrastructure and concrete pad.
• Installation of a new 5,200‑gal AVGAS tank, pump, dispenser cabinet, underground piping, and safety‑enhanced signage.
• Civil site work including grading, erosion control, pavement repair, and turf establishment.
• Electrical and control system upgrades to meet FAA, NFPA, and NEC requirements.
• Mandatory electronic bid submission via Bid Express, with a 5 % bid bond and full compliance certifications.