The Riverside STEM Academy Single Point of Entry project is a fixed‑price construction contract to build a secure, controlled access point at a K‑12 school campus. The scope includes selective demolition, site clearing, grading, utility work, concrete and asphalt paving, installation of ornamental chain‑link fencing with vehicular and pedestrian gates, flagpoles, decorative metal fencing, signage, tactile‑warning surfacing, parking bumpers, and handrail modifications. Work must be phased to avoid disrupting school operations, with after‑hours construction for ramps and prefabricated fencing, and strict compliance with California Building Code, ADA, and fire‑life‑safety requirements. The contract requires a DSA‑certified Class 3 inspector, prevailing‑wage compliance, and submission of detailed shop drawings, product data, and samples before installation.
• Demolition, grading, utility relocation, and paving for a new entryway.
• Installation of fencing, gates, flagpoles, signage, tactile‑warning tiles, and parking accessories.
• Phased construction: lower‑lot work during school hours, upper‑lot work after hours; mandatory handrail compliance per Addendum 1.
• Mandatory pre‑bid job walk and site visit on Dec 2 2025; RFCs due Dec 4 2025; sealed bids due Dec 9 2025.
• Completion required within 77 calendar days after contract start, with DSA‑certified inspection throughout.