Colby Community College is seeking a qualified contractor to design, install, test, and document a full‑fiber‑optic cabling system for the Big Blue Barn building, connecting a new IDF to the existing MDF in the library. The work includes supplying 24‑pair/48‑strand single‑mode armored fiber, conduit, fire‑stop materials, terminations, splicing, labeling, and all required testing and as‑built documentation. The contract must be awarded by mid‑July 2019, with construction completed within four months (by October 31 2019). The vendor must provide detailed pricing, past performance references from academic institutions, certifications (OSHA‑10/30, Hilti fire‑stop, RCDD), and demonstrate good standing with the Construction Workers Union.
• Install 24‑pair/48‑strand single‑mode OS2 armored fiber from MDF to new IDF, including conduit, trays, fire‑stopping, and labeling.
• Perform full optical‑fiber testing, deliver test reports, manufacturer certifications, and as‑built drawings.
• Provide weekly schedule updates, warranty documentation, and comply with college’s normal business‑hour work schedule (8 am‑5 pm CST, Mon‑Fri).