The Fayetteville Public Schools are soliciting bids for the construction of the new Ramay Jr. High School in Fayetteville, AR. The project is broken into numerous separate bid packages covering all aspects of the building, from site work to interior finishes, mechanical systems, and specialized equipment. Bidders must submit a 5% bid bond and must be licensed in Arkansas. All bid documents are available through Clark Contractors or Building Connected, and questions are due June 18, 2026.
• Comprehensive scope includes site railings, precast and structural concrete, structural steel fabrication and erection, waterproofing, roofing, and interior finishes (drywall, painting, flooring, millwork, etc.).
• Specialty trades are also included: elevators, gym equipment, stage curtains, synthetic turf fields, landscaping, and extensive MEP (mechanical, electrical, plumbing) components.
• Bids must be sent to Clark Contractors via email or Building Connected by June 30, 2026, 2:00 PM; a 5% bid bond or cashier’s check is required.