The Navajo Nation is soliciting proposals for the Pinon Chapter Road Maintenance Project, a comprehensive civil construction effort that includes earthwork, drainage installation, concrete structures, metal pipe placement, signage, and traffic control on a Navajo Nation road corridor. The work follows FHWA Standard Specification FP‑14 and must be completed within a 75‑day construction window. Bidders must provide performance and payment bonds, SAM registration, insurance, and adhere to Navajo Nation procurement and cultural compliance requirements.
• Mobilization, surveying, and quality‑control planning per FP‑14 standards.
• Excavation, embankment, geotextile, riprap, and back‑fill for eight drainage crossings, including metal pipe and reinforcing steel installation.
• Structural concrete work, minor concrete pavement, road reconditioning, and installation of two regulatory speed‑limit signs.
• Development and approval of traffic‑control and safety plans ≥ 15 days before construction, with a pre‑proposal site meeting at the project intersection.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.