Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Oregon guideOregon Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Oregon
  4. ›Civil Engineering
  5. ›100543; 100522; 100554 - SW Scholls Ferry Road Sidewalk…

Washington County, Oregon·Oregon

100543; 100522; 100554 - SW Scholls Ferry Road Sidewalk Improvements - SW Laurelwood Avenue to SW 77th Avenue

Closes 3/18/2026$1.5M – $2.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the reconstruction of an existing roadway, including some full-depth reconstruction and resurfacing of the existing roadway. The work includes constructing concrete driveways, curbs, sidewalks, and ADA ramps, as well as installing new signing, illumination, and pavement markings. The project also requires the removal and abandonment of the existing stormwater system and the installation of a new storm conveyance system. Additionally, the project includes the installation of retaining walls, permanent seeding, and temporary traffic control and erosion control measures. The project cost range is estimated to be between $1,000,000 and $3,000,000. • Reconstruction of an existing roadway • Construction of concrete driveways • Construction of curbs, sidewalks, and ADA ramps • Installation of new signing, illumination, and pavement markings • Removal and abandonment of the existing stormwater system • Installation of a new storm conveyance system • Installation of retaining walls • Permanent seeding • Temporary traffic control and erosion control measures

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kira Furby(Engineering Associate)

[email protected]

(503) 969-7990

Key dates

Opened
3/2/2026
Questions due
3/13/2026
Closes
3/18/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310
Solicitation №
2026.029-LUT CPS

Budget estimate

$1,500,000 – $2,500,000

Based on the project cost range of $1,000,000 to $3,000,000, the budget for this project is likely to be within this range. The actual budget will depend on the bid submitted by the contractor and the final contract agreement. The factors that may influence the likely budget range include the complexity of the project, the materials and labor required, and the contractor's experience and reputation. Given the scope of the project, which includes reconstruction of an existing roadway, installation of new stormwater systems, and construction of sidewalks and curbs, the budget is likely to be on the higher end of the estimated range. Therefore, the estimated budget range is $1,500,000 to $2,500,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Charleston County·South Carolina

Top match · 75%

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

City of Fort Wayne·Indiana

74% match

0482S - St. Joe Center Road Sidewalk Extension

Closes 11/12/2026Opened 10/29/2026

NYS East Fishkill, Town of·New York

73% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Cedar Rapids·Iowa

72% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

County of DeKalb, GA·Georgia

72% match

Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

City of Charlotte·North Carolina

72% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

Nevada Government·Nevada

72% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

North Carolina Town of Knightdale·North Carolina

72% match

Old Knight Road Sidewalk Improvement Project

Closes 11/3/2026Opened 9/18/2026

Missouri Department of Transportation·Missouri

72% match

SE District, City of Desloge, sidewalk improvements to N. Desloge Drive

Closes 11/12/2026Opened 10/5/2026

Maryland Carroll County Government - Procurement·Maryland

72% match

ldersburg Area Sidewalk Improvements

Closes 11/18/2026Opened 10/23/2026

Georgia City of Sandy Springs·Georgia

71% match

Dunwoody Road Gap Fill Sidewalk T6026-2

Closes 11/13/2026Opened 10/13/2026

City of Cedar Rapids·Iowa

71% match

34th Street SE from North of Terry Drive to Cottage Grove Avenue

Closes 11/18/2026Opened 10/21/2026

Clark County·Nevada

71% match

Cottonwood Avenue Ponding Mitigation and Sim Street Improvement

Closes 11/3/2026Opened 10/13/2026

City of Fayetteville·North Carolina

71% match

ITB-Breezewood Avenue Sidewalk Improvements

Closes 11/12/2026Opened 10/5/2026

Georgia DeKalb County Government·Georgia

71% match

2026-110-ITB Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

City of Seattle·Washington

71% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026

City of Elk Grove·California

71% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

City of Sunnyvale Procurement Bids and RFPs·California

71% match

Lakewood Safe Routes to School

Closes 11/18/2026Opened 10/23/2026

City of Ormond Beach - Purchasing Office·Florida

71% match

2027 Sidewalk Repair and Replacement

Closes 11/18/2026Opened 10/11/2026

NYS Rochester, City of·New York

71% match

HAZARDOUS SIDEWALK REPLACEMENT PROGRAM - NORTHEAST QUADRANT CONTRACT 2027 PHASE 4

Closes 11/17/2026Opened 10/26/2026

City of Seattle·Washington

71% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

Ohio City of Westerville·Ohio

71% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

Maryland State Highway Administration·Maryland

71% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

Illinois Tollway·Illinois

71% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

City of Seattle·Washington

71% match

Highland Park Way SW Connection

Closes 11/4/2026Opened 10/14/2026