Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Construction
  5. ›South Meadows Multi-Use Recreational Trail Phase V

Connecticut Goodwin University·Connecticut

South Meadows Multi-Use Recreational Trail Phase V

Closes 6/22/2026$1M – $3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The State of CT - DAS Procurement is soliciting bids from qualified contractors for the construction of a public access trail for recreation within the South Meadows located along the east side of the Connecticut River in Wethersfield. The proposed trail will be approximately 1,620 feet in length and 10 feet in width with 2-foot shoulders. The trail will be constructed with bituminous concrete pavement and has been designed to meet ADA accessible requirements. The project is funded in part by the Connecticut Department of Energy and Environmental Protection (CT DEEP) Recreational Trails Grant Program. • The project requires compliance with all applicable State of Connecticut contracting requirements and grant conditions. • The contract is subject to State contract compliance requirements, including spending allocation goals (25% SBE and 6.25% M/W/DisBE) and non-discrimination requirements enforced by the CHRO. • The project involves the construction of a trail with bituminous concrete pavement. • The trail must meet ADA accessible requirements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Bryant Harrell Jr.

[email protected]

(860) 913-2308

Key dates

Opened
5/20/2026
Closes
6/22/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
36962

Budget estimate

$1,000,000 – $3,000,000

The budget for this project can be estimated based on the length and width of the trail. Assuming an average cost of $100 per square foot for bituminous concrete pavement, the total cost for the trail would be approximately $1,620 feet * 10 feet * $100 per square foot = $1,620,000. However, this is a rough estimate and the actual cost may vary depending on various factors such as labor costs, equipment, and materials. Considering these factors, the budget range could be between $1,000,000 and $3,000,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Gainesville - Procurement Division·Florida

Top match · 66%

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Cobb County·Georgia

66% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Harris County·Georgia

65% match

Man-O-War Trail, Phase VI

Closes 1/18/2027Opened 12/5/2022

Ontonagon Valley Sportsmen's Club·Michigan

65% match

Ontonagon Valley Sportsmen's Club South Branch Ontonagon River Canoe Landing

Closes 12/18/2026Opened 9/26/2026

Georgia Cobb County Department of Transportation·Georgia

64% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

Alaska Department of Transportation and Public Facilities·Alaska

64% match

RTP Grant Application - Eastland Trails Phase 2A

Rolling / TBD closeOpened 9/24/2026

Open Space Institute·South Carolina

64% match

The Meadows Boardwalk Trail Project

Closes 11/13/2026Opened 10/23/2026

Illinois Natural Resources·Illinois

63% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

City of Green Cove Springs·Florida

63% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

Open Space Institute·South Carolina

63% match

The Meadows Boardwalk Trail Project

Closes 11/16/2026Opened 10/27/2026

Connecticut Town of Simsbury·Connecticut

63% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

Connecticut City of Middletown·Connecticut

62% match

Bid #2026-008- Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

City of Maryville·Missouri

62% match

South Main Trail Connection Project - Maryville, MO

Closes 11/10/2026Opened 10/8/2026

Open Space Institute·South Carolina

62% match

Meadows Boardwalk Trail Number

Closes 11/16/2026Opened 10/29/2026

Minnesota Department of Administration·Minnesota

62% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

City of Goshen, Indiana·Indiana

62% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

Maryland Department of Natural Resources·Maryland

62% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

City of Hutchinson·Kansas

61% match

Request for Proposal Jim Martinez Trail

Closes 11/20/2026Opened 10/26/2026

Virginia Department of Transportation·Virginia

61% match

B29_2027 SMART SCALE - CONVERT RAILS TO TRAIL

Closes 11/18/2026Opened 10/14/2026

City of Charlotte·North Carolina

61% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

Delaware Valley Regional Planning Commission·Pennsylvania

61% match

Feasibility Study for Naylor's Run and Pennsy Trails (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 11/13/2026Opened 10/5/2026

Alaska Department of Transportation and Public Facilities·Alaska

61% match

RTP Grant Application - Rehabilitation of Multi-Purpose Trail in Galena

Rolling / TBD closeOpened 9/24/2026