The project involves the repair of a culvert at Scales Creek in Houghton County, Michigan. The work includes excavation, backfilling, installation of geotextile fabric, riprap, and native planting turf establishment. The project aims to restore the area to its original condition prior to a 2018 flood. The contractor will be responsible for protecting all public and private property and complying with soil erosion and sediment control measures.
• The project requires the contractor to excavate and backfill the area, install riprap and geotextile fabric, and establish native vegetation.
• The contractor must also provide traffic control measures and ensure that all costs for protecting, removing, and restoring existing improvements are borne by the contractor.
• The project has a duration of 120 days from the notice-to-proceed.
• The contractor must comply with all applicable regulations, including those related to soil erosion and sediment control.
• The project involves the use of MDOT riprap, heavy, and aggregate surface, 6-inch 23AA.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.