Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Minnesota
  4. ›Construction
  5. ›Mississippi River Greenway Trail Reconstruction

Dakota County·Minnesota

Mississippi River Greenway Trail Reconstruction

Closes 5/22/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Dakota County, Minnesota is soliciting qualified contractors to reconstruct the Mississippi River Greenway Trail in the City of Hastings. The fixed‑price contract includes grading, asphalt surfacing, ADA‑compliant sidewalks and ramps, a modular‑block retaining wall, and a suite of ancillary civil works such as storm‑water management, utility connections, and site furnishings. The contractor must adhere to MnDOT specifications, prevailing‑wage rules, and extensive environmental protections for threatened species. The work must be completed within 80 working days, no later than 20 Nov 2026, with a bid deadline of 12 p.m. CT on 22 May 2026. • Scope: 2,683 ft of trail grading, asphalt paving, ADA improvements, retaining wall, drainage, vegetation, and site amenities. • Schedule: Bids due 22 May 2026; construction to finish by 20 Nov 2026 (≈ 80 working days). • Requirements: Electronic bid submission via Quest VirtuBid, bid bond, performance/payments bonds, prevailing‑wage compliance, environmental mitigation for Blanding’s Turtle, Indiana Bat, and other protected species.

Attached files

Contact

Mike Adams

[email protected]

Key dates

Opened
5/12/2026
Closes
5/22/2026
Duration
80 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
CP 42-161 (Project Code 2025-0016389)

Budget estimate

$2,000,000 – $5,000,000

The RFP does not disclose a contract amount, but comparable municipal trail reconstruction projects in Minnesota (2,500–3,000 ft of paved trail with retaining walls and ADA features) typically range from $2 million to $5 million depending on material costs, labor rates, and environmental mitigation. Assuming an average cost of $1,200–$2,000 per linear foot for grading, paving, and associated works, the 2,683 ft scope suggests a base cost of roughly $3.2 million, with additional $0.8–$1.8 million for the retaining wall, furnishings, and species protection measures. Therefore a reasonable estimate for the total contract value is $2 M–$5 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Green Bay·Wisconsin

Top match · 70%

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Kenosha County·Wisconsin

69% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Minnesota Department of Administration·Minnesota

68% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Great Rivers Greenway·Missouri

68% match

GRG 2026-009-725I - Missouri Greenway: Monarch Chesterfield Levee Trail Signage Replacement Project

Closes 11/6/2026Opened 10/12/2026

Illinois Natural Resources·Illinois

67% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

Cobb County·Georgia

66% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Georgia Cobb County Department of Transportation·Georgia

66% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

Maryland Department of Natural Resources·Maryland

66% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

U.S. Department Of Transportation·Mississippi

66% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

Mississippi Department of Finance and Administration·Mississippi

65% match

MMNS Trail Repairs (GS# 610-015)

Closes 11/17/2026Opened 10/15/2026

City of Hampton·Virginia

65% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

City of Shelbyville·Tennessee

65% match

Duck River Greenway Reconstruction & Scenic Overlook

Closes 11/12/2027Opened 9/29/2026

City of Green Cove Springs·Florida

65% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

Georgia Cobb County Department of Transportation·Georgia

64% match

Notice of Intent to Advertise - Design Build Services for the Chattahoochee River Trail Project

Closes 1/15/2027Opened 9/10/2026

City of Madison·Wisconsin

64% match

SAUK CREEK GREENWAY

Closes 1/28/2027Opened 1/28/2027

Mississippi Department of Finance and Administration·Mississippi

64% match

MMNS Trail Repairs – LeFleur's Bluff State Park (Bid #610‑015)

Closes 11/17/2026Opened 10/15/2026

County of Fairfax·Virginia

63% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

Howard County, Office of Procurement·Maryland

63% match

Patuxent Branch Trail Improvements

Closes 12/23/2026Opened 10/23/2026

City of Harrisonburg·Virginia

63% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

Open Space Institute·South Carolina

63% match

The Meadows Boardwalk Trail Project

Closes 11/13/2026Opened 10/23/2026

Georgia Liberty County Board of Commissioners·Georgia

63% match

MAIN TRAIL ROAD IMPROVEMENTS

Closes 11/17/2026Opened 10/14/2026

City of Gainesville - Procurement Division·Florida

62% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Mississippi Department of Finance and Administration·Mississippi

62% match

Road Improvements (GS# 633-003)

Closes 11/19/2026Opened 10/20/2026

City of Cincinnati·Ohio

62% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Brandon·Mississippi

62% match

GRANTS FERRY PARKWAY MULTI-USE PATH PHASE 2

Closes 11/13/2026Opened 10/13/2026