The City of Show Low is seeking qualified contractors to replace aging water‑distribution infrastructure in the southern part of town. The scope includes installing approximately 7,800 ft of new 8‑inch PVC water main, adding fire hydrants, valves, and service connections, and performing associated pavement removal and replacement. The contract is a fixed‑price, 120‑day calendar contract with a $1.02 M engineer’s estimate and a $70 k force‑account allowance for meter‑connection work. Bids must be sealed and submitted by the deadline, and attendance at the mandatory pre‑bid meeting is required.
• Install ~7,800 ft of 8‑inch C900 PVC water main and replace existing 4‑ and 6‑inch mains.
• Provide fire hydrants, water‑valve installations, and approximately 55 water service connections.
• Perform trench excavation, back‑fill, compaction testing, pavement removal, base installation, and asphalt resurfacing.
• Contractor responsible for all testing, traffic control, site safety, and coordination with the City’s engineering staff.
• Contract period: 120 calendar days from Notice‑to‑Proceed; liquidated damages $710 per day for late completion.