The project includes the removal of an existing dam and culvert, and the construction of a new culvert and stream restoration. The project requires the removal of a 45' long, 7.5' corrugated metal pipe arch, a 50' concrete headwall, a 17' concrete spillway and stop log structure, and the construction of a 20' span, 10' tall, and 45' long aluminum multi-plate pipe arch, headwalls, and wingwalls. The project also includes the installation of channel bed material, bank rock, log vanes and sills, and buried grade controls, and the restoration of the natural flow regime to the Cold River.
• The project is located in Rutland, Vermont, and the site visit is mandatory for all bidders.
• The project requires the removal of existing structures and the construction of new ones, including a culvert and stream restoration.
• The project includes the installation of erosion control measures and the restoration of the natural flow regime to the Cold River.
• The project is funded by a grant agreement between the State Natural Resources Conservation Council (NRCC) and the Rutland Natural Resources Conservation District (RNRCD).
• The project requires the contractor to provide proof of insurance, performance bonds, and payment bonds.