Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Harry Britt Building Storefront Doors Replacement

City College of San Francisco·California

Harry Britt Building Storefront Doors Replacement

Closes 7/9/2026$100k – $200kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The San Francisco Community College District is seeking a qualified contractor to replace the storefront doors of the Harry Britt Building. The scope includes demolition of existing doors, field‑verification of door dimensions, supply and installation of new FRP doors with tempered insulated glass, fire‑rated door frames, associated hardware (electric continuous hinges, heavy‑duty continuous hinges, and blank wall plates), low‑voltage CAT‑6 cabling, and ADA‑compliant door operator and actuator systems. Work must be performed during normal business hours, with a site‑specific Cal‑OSHA safety plan approved prior to start. An owner‑controlled allowance of $40,000 is to be included in the base bid, and an optional alternate for seven automatic operator doors is available. • Demolition, disposal per EPA guidelines, and retention of upper sub‑frame portions. • Supply/installation of FRP single‑leaf (36″ × 90″) and double‑leaf (72″ × 90″) doors with 1″ tempered insulated glass, plus fire‑rated frames. • Installation of Von Duprin electric continuous hinges (Model EPT 10) and Grade 1 continuous hinges, plus new low‑voltage CAT‑6 runs (~250 ft each). • ADA modifications: removal of push‑button assemblies, installation of blank wall plates, and provision of LCN 9540 series operators and BEA Sensors LPR‑36 vertical actuators.

Attached files

Key dates

Opened
6/15/2026
Questions due
6/25/2026
Pre-bid meeting
6/23/2026Mandatory
Site visit
6/23/2026Mandatory
Closes
7/9/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238350
Solicitation №
2026-191R

Budget estimate

$100,000 – $200,000

Based on the $40,000 owner allowance, the typical cost range for high‑performance FRP storefront doors (including demolition, disposal, fire‑rated frames, hardware, low‑voltage wiring, and labor) is roughly $100,000 to $200,000 for a project of this size. The lower end assumes minimal alternates and efficient labor rates; the higher end accounts for premium hardware, extensive safety documentation, and potential price escalation on materials.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Municipality of Anchorage·Alaska

Top match · 69%

Harry McDonald Door Replacement

Closes 11/12/2026Opened 10/27/2026

Miami-Dade County Fire Rescue·Florida

67% match

MDFR Fire Station 35 New Four-Fold Xt Exterior Doors

Closes 11/12/2026Opened 10/16/2026

City of Moraine, OH·Ohio

66% match

Replacement of the Moraine Recreation Center Front Doors

Closes 11/5/2026Opened 10/22/2026

Maryland Baltimore City Public Schools·Maryland

66% match

IFB-27043 Door Hardware Replacement at Various Schools-Pkg. 2 Northern Bldg. #402 & Mergenthaler Vocational Technical HS #410

Closes 11/12/2026Opened 10/8/2026

Indian Trail Improvement District·Florida

66% match

Administration Building Roof, Window, and Door Replacement

Closes 11/5/2026Opened 10/4/2026

City of Branson·Missouri

65% match

RFB 2892-02 Overhead Doors & Entryway Doors 2027

Closes 11/4/2026Opened 10/5/2026

Sri Dasavathara Venkateshwara Temple·South Carolina

65% match

front door vandalism protection

Closes 11/10/2026Opened 10/10/2026

U.S. Department Of The Interior·Colorado

65% match

Z--EC-ECAO Exterior Door Replacement

Closes 11/4/2026Opened 10/21/2026

Sweetwater Union High School District·California

65% match

Sweetwater High School Fire Door Replacement Project

Closes 11/19/2026Opened 10/9/2026

Missouri Department of Transportation·Missouri

64% match

FY27 SE Sikeston Office Window Replacement Project

Closes 11/17/2026Opened 10/16/2026

Maryland Baltimore City Public Schools·Maryland

64% match

IFB-27046 Door Hardware Replacement at Various Schools-Pkg. 5 (William Lemmel Bldg. #079, Edmonson HS, Carver Vo Tech)

Closes 11/17/2026Opened 10/10/2026

Maryland Department of Natural Resources - Administration·Maryland

64% match

Nana Drive Entry Doors Replacement & Stabilization Repairs

Closes 11/6/2026Opened 9/30/2026

Rehoboth Baptist Church·South Carolina

64% match

CORRECTION Reinforced Entry Doors

Closes 11/9/2026Opened 10/26/2026

Maryland Baltimore City Public Schools·Maryland

64% match

IFB-27044 Door and Hardware Upgrades Package #3 at Harlem Park Bldg. #078 (Augusta Fells HS #430), Francis M Wood Bldg. #178 (Vivien Thomas Medical Arts Academy #328), & BSA #415

Closes 11/16/2026Opened 10/9/2026

City of Worcester·Massachusetts

64% match

Door & Lock Replacement - Phase IIIB / WPS

Closes 11/13/2026Opened 10/13/2026

Maryland Baltimore City Public Schools·Maryland

63% match

IFB-27045 Door Hardware Replacement at Various Schools-Pkg. 4 (Hayes Blgd. #102, Dunbar MS, Franklin Bldg. #239, Dunbar HS, Digital Harbor HS)

Closes 11/16/2026Opened 10/10/2026