The San Francisco Community College District is seeking a qualified contractor to replace the storefront doors of the Harry Britt Building. The scope includes demolition of existing doors, field‑verification of door dimensions, supply and installation of new FRP doors with tempered insulated glass, fire‑rated door frames, associated hardware (electric continuous hinges, heavy‑duty continuous hinges, and blank wall plates), low‑voltage CAT‑6 cabling, and ADA‑compliant door operator and actuator systems. Work must be performed during normal business hours, with a site‑specific Cal‑OSHA safety plan approved prior to start. An owner‑controlled allowance of $40,000 is to be included in the base bid, and an optional alternate for seven automatic operator doors is available.
• Demolition, disposal per EPA guidelines, and retention of upper sub‑frame portions.
• Supply/installation of FRP single‑leaf (36″ × 90″) and double‑leaf (72″ × 90″) doors with 1″ tempered insulated glass, plus fire‑rated frames.
• Installation of Von Duprin electric continuous hinges (Model EPT 10) and Grade 1 continuous hinges, plus new low‑voltage CAT‑6 runs (~250 ft each).
• ADA modifications: removal of push‑button assemblies, installation of blank wall plates, and provision of LCN 9540 series operators and BEA Sensors LPR‑36 vertical actuators.
Attached files
Similar opportunities
Matched by Bid Banana AI™
Bid Banana · 1.6M+ bids and awards 🍌
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.