Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Delaware guideDelaware Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Delaware
  4. ›Construction
  5. ›RESILIENCY IMPROVEMENTS, KC, CYPRESS BRANCH RD

State of Delaware DOT·Delaware

RESILIENCY IMPROVEMENTS, KC, CYPRESS BRANCH RD

Closes 9/1/2026$150k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation seeks bids for a public‑works construction project to raise a low‑lying segment of Cypress Branch Road in Kent County, Delaware, by 1.75 ft to mitigate tidal flooding, and to install new guardrails, perform earthwork, paving, and associated site work. The contractor must provide all labor, materials, equipment, and comply with numerous environmental permits, including USACE and DNREC wetland permits. The work must be completed within a 32‑day window after a Notice‑to‑Proceed, with a bid deadline of September 1 2026. • Scope includes excavation, embankment fill, Superpave pavement installation, guardrail replacement, erosion‑control measures, and traffic‑control provisions. • Requires a 10 % bid bond, contractor registration with DelDOT, a drug‑testing affidavit, and a performance rating of ≥ 85 %. • No prevailing‑wage requirements, no retainage unless performance‑rating dictates, and mandatory compliance with seasonal environmental restrictions (no in‑water work Mar 1‑Jun 30, no wetland work Apr 1‑Jul 31).

Attached files

Contact

Kimberly Smith(Contract Administration Contact)

DOT‑[email protected]

(302) 760‑2031

Key dates

Opened
8/4/2026
Questions due
8/23/2026
Closes
9/1/2026
Duration
32 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237310
Solicitation №
T202566204

Budget estimate

$150,000 – $500,000

Based on the quantity sheet, estimated unit costs (e.g., Superpave pavement ≈ $120/ton, excavation ≈ $30/cubic yard, borrow material ≈ $15/cubic yard, guardrail ≈ $150/linear foot) suggest a total project cost in the low‑hundreds of thousands of dollars. Adding in traffic‑control, erosion‑control, and ancillary items pushes the estimate toward a mid‑range figure. A reasonable ball‑park range is therefore $150,000 – $500,000, with the lower end reflecting minimal equipment and labor rates and the higher end accounting for premium materials, extensive site‑control measures, and potential overtime.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Grants·California

Top match · 68%

Baldwin Hills & Urban Watersheds Conservancy (BH UWC) Proposition 4: Community and Climate Resilience Grant Program

Rolling / TBD closeOpened 5/6/2026

California Grants·California

68% match

Dam Safety and Climate Resilience Local Assistance

Rolling / TBD closeOpened 5/19/2026

U.S. Department of Homeland Security - FEMA·United States of America

68% match

Fiscal Year 2024 & 2025 Building Resilient Infrastructure and Communities (BRIC)

Rolling / TBD closeOpened 3/25/2026

Sterling Heights·Michigan

68% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

California Grants·California

67% match

Prop 4 – Wildfire and Forest Resilience

Rolling / TBD closeOpened 6/8/2026

California Grants·California

67% match

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

California Grants·California

67% match

Climate Adaptation and Resiliency

Rolling / TBD closeOpened 6/18/2025

California Grants·California

67% match

Proposition 4 – Wildfire and Forest Resilience

Rolling / TBD closeOpened 12/11/2025

Nevada Government·Nevada

66% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Connecticut Energy & Environmental Protection·Connecticut

66% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

City of Charlotte·North Carolina

66% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

Connecticut Energy & Environmental Protection·Connecticut

66% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

66% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

Johnson County Wastewater·Kansas

66% match

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

Connecticut Energy & Environmental Protection·Connecticut

66% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

Illinois Emergency Mgt Agency·Illinois

66% match

2023 Building Resilient Infrastructure and Communities (BRIC)

Rolling / TBD closeOpened 12/22/2025

Missouri Department of Transportation·Missouri

66% match

KC District, City of Gladstone, Improving N. Oak Trafficway from NE 69th Street to NE 72nd.

Closes 11/3/2026Opened 9/24/2026

Illinois Emergency Mgt Agency·Illinois

66% match

FFY 2022 Building Resilient Infrastructure and Communities (BRIC)

Rolling / TBD closeOpened 5/1/2026

Kansas Department of Wildlife and Parks·Kansas

65% match

Pratt Water System Improvements

Closes 11/10/2026Opened 10/12/2026

Connecticut Energy & Environmental Protection·Connecticut

65% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

County of Sacramento·California

65% match

Capital Projects (CP) - Community Care Expansion (CCE) Preservation Program

Closes 12/31/2027Opened 8/14/2023

Clear Creek ISD·Texas

65% match

Brookside, League City, Space Center Intermediate School Renovations

Closes 11/3/2026Opened 10/6/2026

Connecticut Energy & Environmental Protection·Connecticut

65% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026

North Carolina County of Mecklenburg·North Carolina

65% match

Kings Branch at Arrowood Road Phase 2B Stream Restoration

Closes 11/5/2026Opened 10/9/2026

James City County·Virginia

65% match

GROVE NEIGHBORHOOD STORMWATER AND SANITARY SEWER IMPROVEMENTS

Closes 11/12/2026Opened 10/21/2026