Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Mississippi River Project Office - Facility Support Trailer

U.S. Department Of Defense·Illinois

Mississippi River Project Office - Facility Support Trailer

Closes 6/29/2026$50k – $150kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers, Rock Island District, Mississippi River Project Office, requires the purchase of a facility support trailer. The trailer should be a 35-foot deck over gooseneck trailer with specific features such as a heavy-duty self-cleaning angle iron tail, 8'6" trailer width, and a gross weight of at least 30,000 pounds. The trailer should also have electric forward self-adjusting brakes, a spring-assisted ramp, and a gooseneck-style coupler. The contractor should deliver the trailer within six months of the award date. Key features of the trailer include: • 35-foot deck over gooseneck trailer • Heavy-duty self-cleaning angle iron tail • 8'6" trailer width • Gross weight of at least 30,000 pounds • Electric forward self-adjusting brakes • Spring-assisted ramp • Gooseneck-style coupler • Hot-dipped galvanized finish • Apitong flooring installed on the 30-foot deck space • Lockable forward-facing chain rack • Toolbox mounted rear-facing between uprights leading into the gooseneck The contractor should provide a unique item identifier for the delivered item and report the required information at the time of delivery.

Attached files

Contact

Bradley J. Grothus(Contracting Officer)

[email protected]

(563) 726-1136

Key dates

Opened
5/28/2026
Questions due
6/22/2026
Closes
6/29/2026
Duration
6 months

Last updated

Details

Type
Request for Quotation
Industry
Manufacturing
NAICS
336212
Solicitation №
W912EK26QA038

Budget estimate

$50,000 – $150,000

The budget for this opportunity can be estimated based on the cost of manufacturing a 35-foot deck over gooseneck trailer. The cost of materials, labor, and overheads should be considered. A rough estimate for the cost of a trailer of this size could be between $50,000 to $150,000, depending on the features and quality of the trailer. Factors that may influence the likely payment range include the complexity of the trailer design, the materials used, and the production volume.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Louisiana

Top match · 71%

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 5-2025 (OM25005)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 4-2025 (OM25004)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

70% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

City of Tulsa·Oklahoma

69% match

Heavy Equipment Trailer

Closes 11/18/2026Opened 10/22/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 8-2025 (OM25008)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, New Orleans Harbor Cutterhead Dredge No. 1-2025

Closes 4/21/2027Opened 4/22/2025

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 10-2025 (OM25010)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 2-2026 (OM26002)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 4/15/2028Opened 4/16/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

69% match

Portable Restroom Trailer 2027

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 5-2026 (OM26005)

Closes 5/7/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, New Orleans Harbor Cutterhead Dredge No. 2-2025

Closes 4/21/2027Opened 4/22/2025

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 10-2026 (OM26010)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, New Orleans Harbor Cutterhead Dredge No. 2-2025

Closes 5/10/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 8-2026 (OM26008)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Head of Passes, Hopper Dredge Disposal Area, Project #24-2, Plaquemines Parish, LA (ED 24-009)

Closes 12/4/2026Opened 12/5/2024