The Lone Star College System (LSCS) is issuing a Competitive Sealed Proposal (CSP) to construct new public water mains (12‑inch and 8‑inch), a private 8‑inch fire service line, a fire‑rated water meter vault, an RPZ backflow preventer, and an aerobic septic system with drip‑irrigation disposal field at the Kingwood campus. The contractor must provide all labor, materials, equipment, permits, testing, inspections, and close‑out services, adhering to City of Houston standards, Texas regulations, and AWWA specifications. The scope includes excavation, trenchless crossing, surface restoration, traffic control, and documentation. The project budget is approximately $500,000, with a submission deadline of 9/25/2026.
• Construct 12‑in. and 8‑in. PVC water mains along Kingwood Drive and Sorters Road.
• Install private 8‑in. fire service line, fire‑rated meter vault, and RPZ backflow assembly on campus.
• Build an aerobic septic system with drip‑irrigation disposal field.
• Provide all appurtenances, valves, fire hydrants, testing, disinfection, and commissioning.
• Perform excavation, shoring, bedding, backfill, and full surface restoration to pre‑construction conditions.
• Manage traffic control, SWPPP, permits, and close‑out documentation.