Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Mexico guideNew Mexico Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Mexico
  4. ›Construction
  5. ›Farmers Ditch Canal Lining

City of Farmington·New Mexico

Farmers Ditch Canal Lining

Closes 12/2/2025$500k – $1MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Farmington is seeking bids for the construction of a new 6-inch thick reinforced concrete lining for approximately 3,110 linear feet of the Farmers Ditch Canal. The project includes removal of the existing concrete lining, preparation of the foundation, and installation of the new lining. The contractor will be responsible for furnishing all labor, materials, equipment, transportation, permits, supervision, and incidentals necessary to complete the work. The project is expected to take 90 calendar days to complete, with a total contract duration of 3 years. • The contractor must have a Construction License GA-98. • The project will be completed in accordance with the New Mexico Standard Specifications for Public Works Construction. • The contractor must adhere to all OSHA, state, and local safety requirements. • The contractor must provide daily work reports, submittals, and material delivery tickets. • The contractor must maintain a supply of materials and equipment as specified in the contract documents.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Alena Pioche(Purchasing Staff)

[email protected]

(505) 599-1463

Key dates

Opened
10/20/2025
Questions due
11/25/2025
Pre-bid meeting
11/5/2025
Closes
12/2/2025
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
26-164895 Addendum 3

Budget estimate

$500,000 – $1,000,000

Based on the project description, the estimated budget for this project is between $500,000 and $1,000,000. This estimate is based on the scope of work, which includes removal of the existing concrete lining, preparation of the foundation, and installation of the new lining. The contractor will be responsible for furnishing all labor, materials, equipment, transportation, permits, supervision, and incidentals necessary to complete the work. The project is expected to take 90 calendar days to complete, with a total contract duration of 3 years. The Engineer's Opinion of Probable Construction Costs (OPC) is $750,000.00 for the full contract time.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Saline County·Kansas

Top match · 61%

2026 Pipe Lining Project

Closes 11/24/2026Opened 10/19/2026

U.S. Department Of The Interior·Utah

61% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

Terrebonne Parish Consolidated Waterworks District No. 1·Louisiana

61% match

Boudreaux Canal Crossing Waterline Replacement TPCW Project No. H.002244

Closes 11/10/2026Opened 10/13/2026

City of Anderson·South Carolina

61% match

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026Opened 10/12/2026

U.S. Department Of Defense·Missouri

61% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

St. John the Baptist Parish Government·Louisiana

60% match

Bid 2026.27 Canal Maintenance Project

Closes 11/24/2026Opened 10/28/2026

St. Tammany Parish Government·Louisiana

60% match

Wildwood Farms Subdivision Drainage

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of The Interior·Colorado

60% match

Y--EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/25/2026

City of Oldsmar·Florida

60% match

State Street Drainage Ditch Improvements Project

Closes 11/19/2026Opened 9/25/2026

U.S. Department Of The Interior·Arizona

59% match

Y--MOD/MODE/US BYPASS CANAL REPAIRS

Closes 11/20/2026Opened 10/27/2026

City of Farmers Branch·Texas

59% match

Waterline Replacement Engineering Design

Closes 11/3/2026Opened 10/1/2026

Kossuth County Drainage District No. 20 Main 2·Iowa

59% match

Kossuth County Drainage District No. 20 Main 2 Tile Improvement BMI Project No. 25X.138901

Closes 11/17/2026Opened 10/29/2026

Washakie County Conservation District·Wyoming

59% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

Georgia Department of Transportation·Georgia

59% match

T32-D6-Drainage A1 Cherokee-Pickens-194617

Closes 11/17/2026Opened 10/28/2026

City of Hutchinson·Minnesota

58% match

Hutchinson, City of South Fork Crow River Sediment Forebay BMI No. 0W1.123849

Closes 12/1/2026Opened 10/29/2026

Massachusetts Town of Brewster·Massachusetts

58% match

Culvert & Bank Stabilization work

Closes 11/5/2026Opened 9/23/2026

U.S. Department Of Defense·Louisiana

58% match

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana

Closes 2/6/2027Opened 11/5/2024

St. Louis County, MN - Purchasing Division·Minnesota

58% match

Stream Mitigation Bank Development

Closes 11/9/2026Opened 10/19/2026

Snohomish County·Washington

58% match

2027 123rd Ave NE Culvert Replacements – RR48109, WC8109, UPI 21-20028

Closes 11/3/2026Opened 9/30/2026

The Village of Royal Palm Beach·Florida

58% match

SR80 Irrigation Boring

Closes 11/13/2026Opened 10/30/2026

City of Austin·Texas

58% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

U.S. Department Of Defense·Missouri

58% match

Corning and Holt 10 Levee Repairs

Closes 7/21/2027Opened 7/21/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

58% match

AMR, Cambria & Westmoreland Cnties

Closes 11/12/2026Opened 10/16/2026

City of Fitchburg·Wisconsin

58% match

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

U.S. Department Of Defense·Louisiana

58% match

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 3-2026, OM26061

Closes 6/12/2028Opened 6/14/2026