Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›Middle Sanpoil River Large Wood Placement Reach 4A and 4B

Confederated Tribes of the Colville Reservation·Washington

Middle Sanpoil River Large Wood Placement Reach 4A and 4B

Closes 4/29/2026$2M – $5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Confederated Tribes of the Colville Reservation are seeking a qualified contractor to design and install engineered large‑wood structures, beaver‑dam analogues, and associated riparian planting on the Middle Sanpoil River (Reaches 4A and 4B). The work includes in‑water construction of engineered log jams, temporary stream diversions, site restoration, and post‑construction vegetation establishment, with strict environmental, cultural, and tribal‑preference requirements. The contract is fixed‑price, with a base‑bid for Reach 4A and an additive‑bid for Reach 4B, and must be performed primarily within the 2026 in‑water work window, though Reach 4B may extend into 2027. • Construct engineered log jams, channel‑spanning ELJs, beaver‑dam analogues, and post‑assisted log structures using tribe‑provided logs and contractor‑supplied boulders. • Perform vegetation management, planting, seeding, and site restoration to meet a 60 % plant‑survival guarantee. • Obtain and comply with multiple permits (WSDOT, EPA NPDES, Corps 404, Tribal hydraulic and cultural permits) and adhere to Indian preference and Davis‑Bacon wage requirements. • Provide engineering oversight (minimum two days per week) and submit progress‑based payments with 25 % retainage or performance bond.

Attached files

Contact

Bryan Jones(Fish & Wildlife)

[email protected]

(509) 634-2277

Key dates

Opened
3/30/2026
Questions due
4/22/2026
Site visit
4/21/2026
Closes
4/29/2026
Duration
12 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237990

Budget estimate

$2,000,000 – $5,000,000

No contract value is disclosed, but similar river‑restoration projects of ~3 river miles with engineered log jams, boulders, and extensive planting typically range from $2 million to $5 million depending on material costs, equipment mobilization, labor, and tribal preference fees. The estimate assumes $1‑$1.5 million for Reach 4A and $1.5‑$3.5 million for Reach 4B, plus a 5 % TERO fee and retainage.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Washakie County Conservation District·Wyoming

Top match · 63%

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

St. Johns River Water Management District·Florida

63% match

Sunnyhill Restoration Area, West Tract 2027 Timber Sale

Closes 11/10/2026Opened 10/26/2026

Oregon Department of Fish and Wildlife·Oregon

63% match

Large Wood Harvest Staging - Anthony Creek Uplift

Closes 11/16/2026Opened 10/21/2026

Confederated Tribes of the Colville Reservation·Washington

63% match

F&W Anadromous Fisheries Division, Salmon Creek RM8 Fish log procurement

Closes 11/19/2026Opened 10/14/2026

Clean River Partners·Minnesota

63% match

Clean River Partners Cannon River Fish Passage Improvements Project No. 24X.135410

Closes 11/20/2026Opened 10/29/2026

U.S. Department Of Defense·Michigan

63% match

Sebewaing River South Levee Repairs

Closes 1/23/2027Opened 11/17/2025

California Grants·California

62% match

Prop 4 – Wildfire and Forest Resilience

Rolling / TBD closeOpened 6/8/2026

St. Johns River Water Management District·Florida

62% match

Sunnyhill Restoration Area, West Tract 2027 Timber Sale

Closes 11/10/2026Opened 10/26/2026

Confederated Tribes of the Colville Reservation·Washington

62% match

F&W Anadromous Fisheries Division, Salmon Creek RM8 Fish log procurement

Closes 11/19/2026Opened 10/14/2026

California Grants·California

62% match

Proposition 4 – River

Rolling / TBD closeOpened 6/11/2025

U.S. Department Of Defense·Nebraska

62% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 9/22/2027Opened 9/22/2026

Florida St. Johns River Water Management Dist·Florida

62% match

Sunnyhill Restoration Area, West Tract 2027 Timber Sale

Closes 11/10/2026Opened 10/26/2026

Santa Clara Valley Water District·California

62% match

COYOTE-ALAMITOS CANAL SHOTCRETE REPAIRS

Closes 11/10/2026Opened 10/13/2026

California Grants·California

61% match

Proposition 1 Lower Los Angeles River Grants

Rolling / TBD closeOpened 1/27/2025

Pennsylvania Department of Conservation and Natural Resources Bureau of Forestry, Silviculture Section·Pennsylvania

61% match

Timber Sale – Wallnado (09‑2025BC10)

Closes 11/4/2026Opened 8/20/2026

City of Austin·Texas

61% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

City of Cedar Rapids·Iowa

61% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

U.S. Department Of Defense·Missouri

61% match

Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)

Closes 1/22/2027Opened 10/30/2026

City of Cedar Rapids·Iowa

61% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Hutchinson·Minnesota

61% match

Hutchinson, City of South Fork Crow River Sediment Forebay BMI No. 0W1.123849

Closes 12/1/2026Opened 10/29/2026

City of Cedar Rapids·Iowa

61% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

61% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026