Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Surge Pool Inlet Blocking, North Springfield Lake…

U.S. Department Of Defense·Massachusetts

Surge Pool Inlet Blocking, North Springfield Lake, Perkinsville, VT

Closes 8/23/2026$25k – $100kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers – New England District is issuing a pre-solicitation notice for the Surge Pool Inlet Blocking project at North Springfield Lake, Perkinsville, VT. The work consists of furnishing all labor, materials, and equipment necessary for blocking the water inlets to the surge pool and backfilling the surge pool at Tolles Hill Dam. The magnitude of construction is between $25,000 and $100,000. • The solicitation will be available on or about August 18, 2026, and will only be available online through the Contract Opportunities website (www.SAM.gov). • This procurement is set-aside for small business vendors with an applicable NAICS code of 238910 and a Small Business Size Standard of $19 Million. • All vendors must have an active registration in SAM.gov at the time of submission to be considered.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jennifer Samela

[email protected]

(978) 318-8324

Key dates

Opened
7/31/2026
Closes
8/23/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238910
Solicitation №
W912WJ26QA159

Budget estimate

$25,000 – $100,000

The budget for this opportunity can be estimated based on the magnitude of construction, which is between $25,000 and $100,000. Considering the scope of work, which involves blocking water inlets and backfilling the surge pool, the estimated budget is likely to be closer to the higher end of this range, around $80,000 to $90,000. However, this is a rough estimate and the actual budget may vary depending on the complexity of the project and the contractor's bid.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Springfield·Vermont

Top match · 66%

Springfield Water Service Hydroexcavation

Closes 11/6/2026Opened 10/12/2026

Department of Buildings & General Services·Vermont

66% match

Kettle Pond State Park Drinking Water System

Closes 11/4/2026Opened 10/7/2026

City of Farmington·New Mexico

64% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

Virginia Polytechnic Institute and State University·Virginia

63% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

Department of Buildings & General Services·Vermont

63% match

Groton State Forest Beaver Depot Flood Repairs

Closes 11/5/2026Opened 10/7/2026

Town of Eatonville·Florida

63% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

Barnet Fire District No. 2·Vermont

62% match

Barnet Fire District No. 2 Potable Water Supply PFAS Mitigation

Closes 12/3/2026Opened 10/28/2026

Massachusetts Department of Environmental Protection·Massachusetts

62% match

DEP-BWR-NOI-FY27-Ipswich Basin PFAS GrantANNOUNCEMENT ONLY

Closes 11/6/2026Opened 10/6/2026

City of Charlotte·North Carolina

62% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

Virginia Polytechnic Institute and State University·Virginia

62% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026Opened 10/6/2026

Georgia City of Cartersville·Georgia

62% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Alaska Department of Environmental Conservation·Alaska

62% match

University of Alaska Southeast Water Line Improvements Categorical Exclusion Determination

Rolling / TBD closeOpened 10/9/2026

Town of Burke·Vermont

62% match

West Burke Village Wastewater

Closes 11/5/2026Opened 10/8/2026

City of Cincinnati·Ohio

62% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/5/2026Opened 10/26/2026

Town of Bennington·Vermont

62% match

TOWN OF BENNINGTON BENNINGTON, VERMONT WATER RESOURCES DIVISION MONUMENT AVENUE EXTENSION DWSRF RF3-559

Closes 11/19/2026Opened 10/6/2026

Massachusetts City of Newburyport·Massachusetts

62% match

IFB No. 27-07 Bartlet Mall Restoration Project

Closes 12/17/2026Opened 10/28/2026

Connecticut City of New Britain·Connecticut

62% match

27-009 Willow Brook Park Pool Filter Replacement

Closes 11/24/2026Opened 10/30/2026

City Utilities of Springfield·Missouri

62% match

Water Mitigation & Minor Restoration Services

Closes 11/16/2026Opened 10/28/2026

City of Farmington·New Mexico

62% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

City of Charlotte·North Carolina

62% match

Mallard Connector Main

Rolling / TBD closeOpened 3/1/2027

Massachusetts City of Springfield·Massachusetts

62% match

27-065: Improvements to Clarendon Street Fountain

Closes 11/18/2026Opened 10/28/2026

City of Nashua·New Hampshire

61% match

Rotary Pool Replacement Construction

Closes 11/4/2026Opened 10/8/2026

City of Murfreesboro·Tennessee

61% match

Auxiliary Lake Intake Sediment and Debris Removal

Closes 11/13/2026Opened 10/20/2026

Western Virginia Water Authority·Virginia

61% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Defense·Kentucky

61% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026