The Covina‑Valley Unified School District is soliciting sealed bids for a combined exterior roof replacement and interior classroom renovation project at Northview High School’s North Building. The roofing scope calls for complete removal of the existing roof system and installation of a Tremco TREMPLY KEE single‑ply membrane with a 20‑year manufacturer’s warranty, new insulation, flashings, gutters, downspouts, and related roof‑deck work. Interior work covers five classrooms (approximately 800 sq ft each) and includes removal and replacement of acoustic ceiling tiles, installation of owner‑furnished vinyl tackboard and whiteboard panels, new Tandus Powerbond carpet (district‑provided), rubber base, cove base, and painting of interior doors and ceilings. Required alternates (moisture barrier for flooring, full ceiling‑tile replacement, and 200 sf of roof plywood) must be priced and are additive to the base bid. The project also mandates compliance with California Title 24, CAL GREEN, and fire‑code regulations, OSHA fall‑protection, and hazardous‑material handling coordination.
• Roof: full tear‑off, install TREMPLY KEE membrane, new insulation, flashings, gutters, drainage, 20‑year warranty.
• Interior classrooms: new carpet, rubber base, acoustic ceiling tiles, vinyl tackboard & Magnaboard panels, paint doors/ceilings, cove base, demolition of existing finishes.
• Mandatory pre‑bid job walk on March 31, 2026 (8:30 AM) and optional site visit April 7, 2026 (9:00 AM).
• Required alternates for moisture barrier, full ceiling‑tile replacement, and limited roof‑ply plywood must be included in the total bid.
• All work must meet California energy, green‑building, and fire‑code standards; hazardous‑material reports will be supplied by the District.