The City of Ann Arbor is seeking a qualified contractor to execute comprehensive improvements at South Maple Park and Dexter Park. The work includes full site preparation, grading, tree and stump removal, new sidewalks, parking lot paving, storm‑water infrastructure, utility installation, construction of pickleball, tennis, and basketball courts (post‑tensioned concrete or HMA alternate), a pre‑engineered timber pavilion with concrete pad, lighting (solar dock), benches, trash receptacles, bike bollards, landscaping, and related site furnishings. The contract will be awarded as a lump‑sum unit‑price bid, with a mandatory 5 % bid bond, performance and labor‑material bonds equal to the bid price, and compliance with Ann Arbor prevailing‑wage and living‑wage ordinances. Work must be started after notice to proceed and completed within 245 calendar days. Evaluation will consider qualifications, safety, workforce development, equity/sustainability, schedule, and price.
• Site work: grading, drainage, utility relocations, storm‑sewer, water and sanitary sewer ties.
• Hardscape: 4‑in. concrete sidewalks, parking lot HMA, post‑tensioned concrete (or HMA) courts, concrete pavilion pad, fencing, pavement markings, ADA signage.
• Amenities: solar lighting, benches, trash receptacles, bike bollards, accessible grill, picnic table, water fountain.
• Landscaping: tree removal, bioswale planting, turf establishment, irrigation.
• Compliance: Prevailing‑wage, Living‑wage, non‑discrimination, insurance/bond requirements, safety training, and potential GHG/energy reporting.