Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›WATER MAIN EXTENSION

Georgia Monroe County Board of Commissioners·Georgia

WATER MAIN EXTENSION

Closes 5/14/2026$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Monroe County Board of Commissioners is seeking sealed bids for the construction of a Water Main along Ray Hartley Road. The project includes furnishing and installing approximately 2,830 linear feet of 8-inch C900 DR 18 PVC and FPVC water main, along with associated hydrants, valves, fittings, joint restraints, clearing, erosion control, and connection to the existing water system on Rumble Road. The installation method will be by open trench and horizontal directional drilling. The contract time is 120 calendar days, with liquidated damages of $250 per day for delays. The contract will be awarded based on the total sum bid. • The project requires the installation of 2,830 linear feet of 8-inch C900 DR 18 PVC and FPVC water main. • The installation method will be by open trench and horizontal directional drilling. • The contract time is 120 calendar days, with liquidated damages of $250 per day for delays. • The contract will be awarded based on the total sum bid. • Contractors must be licensed utility contractors in Georgia. • Electronic copies of contract documents may be obtained by contacting Lindsey Harris at the office of the Engineer, Carter Engineering Group.

Attached files

Contact

Lindsey Harris(Buyer Contact)

[email protected]

(478) 219-2600

Key dates

Opened
4/14/2026
Closes
5/14/2026
Duration
120 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
PE-70200-NONST-2026-000000023

Budget estimate

$500,000 – $1,500,000

The estimated budget for this project can be determined by considering the cost of materials, labor, and equipment necessary for the construction of the Water Main. The project requires the installation of approximately 2,830 linear feet of 8-inch C900 DR 18 PVC and FPVC water main, which can cost around $100 to $200 per linear foot, depending on the location and other factors. Additionally, the cost of labor, equipment, and other expenses should be taken into account. Based on these factors, the estimated budget for this project can be around $500,000 to $1,500,000. The factors that may influence the likely payment range include the cost of materials, labor, and equipment, as well as the location and complexity of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Florida Governmental Utility Authority·Florida

Top match · 74%

Meadow Road and 28th St. Water Main Extension

Closes 11/24/2026Opened 10/19/2026

Georgia Rockdale County Board of Commissioners·Georgia

73% match

Water Main Extensions

Closes 12/3/2026Opened 10/26/2026

City of Charlotte·North Carolina

71% match

Fiscal Year 2026 Street Main Extensions Contract 1

Rolling / TBD closeOpened 1/15/2026

The City of Columbus·Ohio

71% match

RFQ033929 - OSU Innovation District Waterline Extension 690236-100174

Closes 11/18/2026Opened 10/26/2026

City of Charlotte·North Carolina

69% match

Fiscal Year 2026 Street Main Extensions Contract 2

Rolling / TBD closeOpened 1/15/2026

City of Columbus Ohio·Ohio

69% match

OSU Innovation District Waterline Extension

Closes 11/18/2026Opened 10/26/2026

City of Muskogee·Oklahoma

68% match

Addendum 1 - HWY 165 Waterline Extension

Rolling / TBD closeOpened 9/16/2026

Hastings Utilities·Nebraska

68% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

City of Hastings Public Works / Utilities·Nebraska

68% match

Lakeview 11th Water & SS Extension Dist 2026-1 HU 2026-77

Rolling / TBD closeOpened 7/21/2026

City of Ontario·California

68% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/6/2026

Clermont County - Board of Commissioners·Ohio

67% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

City of DeLand·Florida

67% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

CPPJ- Special Service Districts·Louisiana

67% match

Nelson Road Waterline Expansion Project

Closes 11/17/2026Opened 10/20/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

Northern Kentucky Water District·Kentucky

67% match

Amsterdam Road Water Main Replacement

Closes 1/31/2027Opened 10/13/2026

County of Moore·North Carolina

66% match

Engineering Services - East Moore Water District Phase 5 Water Main Extension

Closes 11/12/2026Opened 10/22/2026

City of Chelan·Washington

66% match

Airport Watermain Extension

Closes 11/5/2026Opened 10/16/2026

City of Salina·Kansas

66% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

66% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of Bellevue·Washington

66% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

New York City Department of Design and Construction·New York

66% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/24/2025

City of Salina·Kansas

66% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/3/2026

U.S. Department Of The Interior·North Dakota

66% match

Y--White Horse Hill National Game Preserve Water Main Extension

Closes 12/3/2026Opened 10/19/2026