The City of Worcester is soliciting bids for a comprehensive renovation of the hydraulic passenger elevator at the DCU Center. The scope includes selective demolition of existing elevator components, full upgrade of the hydraulic system, and associated mechanical, plumbing, HVAC, and electrical work throughout the machine room, hoistway, and surrounding areas. Bidders must submit both general bids and filed sub‑bids for specified trades (elevator, plumbing, HVAC, electrical), meet Massachusetts prevailing‑wage and MWBE participation goals, provide required insurance and performance bonds, and adhere to strict code and safety requirements. An accelerated‑schedule alternate is offered for contractors able to complete the work within an eight‑week window in mid‑2026.
• Renovate a hydraulic passenger elevator (new pump, controller, doors, fire‑fighter service mode, etc.)
• Perform related MEP upgrades: plumbing, HVAC, electrical, fire‑stop, fire‑alarm integration, and fire‑rated construction
• Required sub‑bids for trades: Elevators, Plumbing, HVAC, Electrical; MWBE goals = 10 % MBE, 15 % WBE
• Bonds & insurance: 5 % bid deposit, performance & labor‑materials bonds equal to contract sum; commercial liability $1M/$2M, auto $2M, excess $2M
• Timeline: Bids due 12/17/2025 10:00 AM; substantial completion by August 31 2026; optional accelerated schedule (June‑August 2026).