The City of Flint is seeking a qualified contractor to remove existing fuel storage tanks and install new Roth double‑wall bulk‑fluid containment systems across its fleet garage. The scope includes disposal of legacy tanks, site preparation, delivery and installation of three 400‑gal and four 110‑gal double‑walled tanks, associated piping and controls, and full compliance testing. The contractor must be Roth‑certified, obtain all permits, and complete the work by the end of May 2026.
• Remove three 300‑gal oil tanks, one coolant tank, and four 55‑gal drum stations.
• Install three 400‑gal and four 110‑gal Roth double‑walled storage tank systems with UL SU2258 certification.
• Provide full engineering, permitting, excavation, concrete pads, piping, gauges, testing, and one‑year warranty.
• Deliver all equipment, handle hazardous‑material disposal, and meet EPA SPCC, NFPA 30/30A, and local code requirements.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.