Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Virginia guideVirginia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Virginia
  4. ›Water and Wastewater
  5. ›Atlantic Treatment Plant Blower Controls Upgrade - SS Elect

Hampton Roads Sanitation District·Virginia

Atlantic Treatment Plant Blower Controls Upgrade - SS Elect

Closes 5/27/2026$100k – $250kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

• Scope: Electrical and control system upgrade for blower units at the Atlantic Treatment Plant. • Requirements: Provide design, hardware, installation, testing, and commissioning; all work must comply with HRSD standards. • Eligibility: Must be a registered supplier with Hampton Roads Sanitation District; registration instructions attached. • Timeline: Posting on May 12 2026 with bid deadline May 27 2026. • Contact: Caitlin Geer (Buyer) – HRSD Help Desk at [email protected].

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Caitlin Geer(Buyer)

[email protected]

Key dates

Opened
5/12/2026
Closes
5/27/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
238210
Solicitation №
IFB-120080

Budget estimate

$100,000 – $250,000

Based on typical costs for electrical control upgrades at medium‑size water‑treatment plants, the contract is likely in the low‑to‑mid six‑figure range. Factors influencing cost include the number of blower units, the need for custom stainless‑steel enclosures, and integration with existing plant control systems. A reasonable estimate would be between $100,000 and $250,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

South Coast Air Quality Management District·California

Top match · 67%

Cargo Handling Equipment, Locomotives, Ships at Berth Emissions Capture and Control Systems, and Transport Refrigeration Units Proposition 1B - Goods Movement Emission Reduction Program

Closes 11/20/2026Opened 9/8/2026

U.S. Department Of Defense·District of Columbia

66% match

Shipboard Air Conditioning Plant System Sustainment Plan (SSP)

Closes 11/16/2026Opened 10/23/2026

Contra Costa Water District·California

66% match

City of Brentwood Water Treatment Plant Actuator and Control System Upgrades

Closes 11/10/2026Opened 10/1/2026

Dodge County·Wisconsin

66% match

Update HVAC Controls

Closes 11/16/2026Opened 10/22/2026

North Carolina Town of Cary·North Carolina

66% match

Swift Creek Pump Station PLC Improvements

Closes 11/9/2026Opened 10/15/2026

Town of Narragansett·Rhode Island

65% match

Stand-by Generator Replacement - Wastewater Treatment Plant

Closes 11/6/2026Opened 10/9/2026

New York City Department of Environmental Protection·New York

65% match

82626B0015-BWT-TI-181 Replacement of the Multi-Rake Climber Screen & Degritting System Installation

Closes 12/2/2026Opened 10/21/2026

Maryland Environmental Service - Procurement Division·Maryland

65% match

Dorsey Run Wastewater Treatment Plant Minor Upgrades - MBE 20%

Closes 11/6/2026Opened 9/23/2026

Palm Beach County PBC·Florida

65% match

Supervisory of Elections HVAC Replacement Project

Closes 11/12/2026Opened 10/27/2026

Upper Occoquan Service Authority·Virginia

65% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

City of Freeport·New York

65% match

INSTALLATION OF NEW MOTOR CONTROL CENTER AND AUTOMATIC BLOW OFF FOR WELL #9

Closes 11/6/2026Opened 10/26/2026

Georgia City of Carrollton·Georgia

65% match

WTP SCADA and Filter Control System Improvements

Closes 12/3/2026Opened 10/29/2026

Department of Corrections·South Carolina

65% match

Security and Maintenance Upgrades - HVAC, Chiller and Kitchen Boiler Replacement - Headquarters - Replace Air Handlers

Closes 11/17/2026Opened 10/14/2026

UCLA Capital Programs·California

64% match

Cogeneration Plant New Electric Chiller (PREQUALIFICATION)

Closes 11/5/2026Opened 10/21/2026

Florida School for the Deaf and the Blind (FSDB)·Florida

64% match

PUBLIC ANNOUNCEMENT FOR HVAC CONTROL UPGRADES (PHASE II) RFP-27-047

Closes 12/9/2026Opened 10/23/2026

Columbia County·Wisconsin

64% match

PREMISYS TO GENETEC PANEL UPGRADE

Closes 11/20/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

64% match

28--BLOWER,ENGINE,EAPS, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/23/2026

Atlantic County Utilities Authority, NJ·New Jersey

64% match

Develop Solid Waste Conversion Facility at the Atlantic County Utilities Authority

Closes 12/9/2026Opened 10/13/2026

U.S. Department Of Defense·Oregon

64% match

John Day Dam Powerhouse HVAC Upgrades

Closes 12/31/2026Opened 4/1/2026

City of Clearwater·Florida

64% match

Northeast Advanced Pollution Control Facility Install Generator Docking Station at Sand Filter and Reclaim Buildings

Closes 12/16/2026Opened 10/28/2026

New York City Department of Environmental Protection·New York

64% match

82625B0045-BWT-BB-236 Replacement of the Cyclone Degritters and Grit Washers at the Bowery Bay WWTP

Closes 11/12/2026Opened 9/28/2026

University of Massachusetts·Massachusetts

64% match

Efficiency Review of Chiller Plants Operation & Maintenance

Closes 11/13/2026Opened 10/16/2026

U.S. Department Of Defense·United States of America

64% match

PANEL,CONTROL,ELECT

Closes 11/2/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

64% match

28--BLOWER,ENGINE,EAPS, IN REPAIR/MODIFICATION OF

Closes 11/1/2026Opened 9/16/2026

Power Authority of New York·New York

64% match

ZEBRA MUSSEL CONTROL SERVICES

Closes 11/23/2026Opened 10/30/2026