The Kenosha Unified School District is seeking a qualified contractor to modernize the hydraulic passenger elevator at Bradford High School. The scope is turn‑key, covering removal of the existing system, installation of new hydraulic equipment, cab refurbishment, hoist‑way upgrades, control‑room work, testing, commissioning, and documentation, with a firm substantial‑completion deadline of August 21 2026. The project excludes fire‑alarm, HVAC, emergency power, sprinkler, and communications work, which will be contracted separately. Bidders must attend a mandatory pre‑bid walk‑through on February 10, submit sealed bids by February 24 (1 p.m.), and provide a 10 % bid bond, performance bond, and required insurance. The District will award the contract within 30 days of opening, provided the bid does not exceed available funding.
• Turn‑key hydraulic elevator modernization (removal, new pump, new cab, control system, hoist‑way upgrades).
• Mandatory pre‑bid site walk‑through on Feb 10, 2026; sealed‑bid submission due Feb 24, 2026, 1 p.m.
• Completion required by Aug 21, 2026; no extensions granted; performance and insurance bonds required.