Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Civil Engineering
  5. ›2A N 9TH ST ROAD RECON AND WATERMAIN REPLACEMENT- MYSTIC…

Colorado City of Canon City·Colorado

2A N 9TH ST ROAD RECON AND WATERMAIN REPLACEMENT- MYSTIC TO MEADOWS

Closes 12/3/2025$5M – $15MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Canon City is seeking bids for the reconstruction of approximately 0.7 miles of roadway in Canon City, Colorado. The project will entail the construction of associated curb and gutter, sidewalk, irrigation ditch box culvert and stormwater improvements, reconstruction of the existing roadway, replacement of approximately 3,300 ft of water main and associated water services, and other work incidental to completion. • The project anticipates funding from the Colorado State Revolving Fund (SRF) loan program. • Disadvantaged Business Enterprise (DBE) requirements and goals are included. • Certified DBEs or a consortium of certified DBEs are encouraged to bid. • The project should be bid to construct with RCP as designed. • The contract time for weather delays shall only be extended for reasonable periods of time related to unanticipated adverse weather conditions.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Ted Dell(City Engineer)

[email protected]

(719) 276-5240

Key dates

Opened
10/31/2025
Questions due
11/25/2025
Pre-bid meeting
11/7/2025
Closes
12/3/2025
Duration
270 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310
Solicitation №
72-25

Budget estimate

$5,000,000 – $15,000,000

The budget for this project can be estimated based on the scope of work, which includes the reconstruction of approximately 0.7 miles of roadway and the replacement of approximately 3,300 ft of water main. The cost of materials, labor, and equipment will be significant, and the project may require specialized equipment and expertise. Assuming an average cost per mile of roadway reconstruction and watermain replacement, the total cost of the project could be in the range of $5 million to $15 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Clermont County - Board of Commissioners·Ohio

Top match · 63%

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

Massachusetts Town of Westborough·Massachusetts

62% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

Massachusetts Department of Transportation·Massachusetts

61% match

616396 DISTRICT 1 Scheduled and Emergency Drainage, Slope, and Roadway Repairs/Improvements at Var

Closes 11/17/2026Opened 10/26/2026

Moore & Bruggink, Inc·Michigan

61% match

250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path

Closes 11/12/2026Opened 10/27/2026

City of Waukegan·Illinois

61% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

Massachusetts Department of Transportation·Massachusetts

60% match

611974 MEDFORD FAP No. HSI/HSI(VUS)-003S(991)X Intersection Improvements at Main Street/South Stre

Closes 11/10/2026Opened 9/14/2026

Town of Medfield·Massachusetts

60% match

MSH Roadway & Infrastructure Improvements (Phase 2)

Closes 11/19/2026Opened 10/28/2026

City of Northampton·Massachusetts

60% match

Bright Avenue Reconstruction and Utilities Replacement

Closes 11/4/2026Opened 10/14/2026

Massachusetts Department of Transportation·Massachusetts

60% match

609068 SHEFFIELD FAP No. STP(BR-OFF)-003S(993)X Bridge Replacement, S-10-015, Kelsey Road over Sch

Closes 11/10/2026Opened 9/8/2026

NYS Suffolk County·New York

60% match

Federal Aid Resurfacing of CR 83, Patchogue-Mt. Sinai Road from the Vicinity of NYS 112 to the Vicinity of Canal Road, Town of Brookhaven

Closes 11/12/2026Opened 10/1/2026

City of Cincinnati·Ohio

60% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/6/2026Opened 9/10/2026

Vermont Agency of Transportation - Contract Administration·Vermont

60% match

Norwich-Bradford IM 091-2(99)

Closes 11/13/2026Opened 10/21/2026

City of Daytona Beach·Florida

60% match

2701TB - Tomoka Farms Road & Bellevue Avenue Watermain Realignment Project

Closes 11/5/2026Opened 10/1/2026

City of Lebanon·Indiana

60% match

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

City of Bellevue·Washington

60% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Shawnee·Kansas

60% match

Ordinance No. 3509

Closes 10/22/2030Opened 10/22/2024

Idaho Transportation Department·Idaho

60% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

Catawba Regional Council of Governments·South Carolina

60% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Hastings Utilities·Nebraska

60% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

New York City Department of Sanitation·New York

60% match

82726B0005-Bronx Community Districts 9, 10 & 11 Garage Demolition and Replacement, 800 Zerega Avenue, Bronx, NY 10473 and South Lot Swing Space, 530 Zerega Avenue, Bronx, NY 10473

Closes 3/4/2027Opened 7/20/2026

Connecticut City of Norwich·Connecticut

60% match

REHABILITATION OF A 0.41 MILE SECTION OF HUNTERS ROAD AND CULVERTS REPLACEMENT

Closes 11/27/2026Opened 9/21/2026

Massachusetts Town of Plymouth·Massachusetts

60% match

22620 Sandwich Road Water Main Replacement

Closes 11/5/2026Opened 10/15/2026

Minnesota Department of Administration·Minnesota

60% match

REBID #2 - Legend Golf Course Renovation and Irrigation Replacement

Closes 11/13/2026Opened 10/16/2026

City of Mason·Ohio

59% match

Snider Road Widening Project - Phase 2

Closes 11/17/2026Opened 10/19/2026

NYS Niagara County·New York

59% match

PIN 5765.39: D041682, Replacement of CR 55 Royalton Center Road Bridge (BIN 3360080) over Mud Creek in the Town of Royalton, Niagara County

Closes 11/5/2026Opened 9/24/2026