The City of Saco is seeking a contractor to replace approximately 420 feet of 2‑inch waterline at the Camp Ellis Pier, including trench excavation, installation of a new PE‑3608 pipe, back‑flow prevention device, and meter pit replacement. Bids must be sealed and submitted by 1 PM on February 13 2020, with a public opening at the same time. The contractor must provide all labor, materials, equipment, traffic‑control plans, and maintain an 11‑ft travel lane; work is limited to weekdays (7 AM‑sunset) and must be completed by May 15 2020. Addenda clarify a minimum 4‑ft clearance from the bathroom facility, no curb restoration required, and that the contractor supplies the water line, double‑check valve assembly, and a new meter pit meeting Maine Water Company standards.
• Replace existing waterline (≈ 420 ft) with 2‑in. PE‑3608 pipe and tracer wire.
• Provide and install double‑check valve assembly and new meter pit.
• Complete trenching, backfill, and traffic‑control while keeping an 11‑ft travel lane open.
• Submit sealed bid by 1 PM Feb 13 2020; finish work by 15 May 2020.
Attached files
Contact
Travis Moore(Deputy Director, Public Works Department)
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.