This pre‑award bid tabulation details a comprehensive restoration project for gravity sewer mains that were damaged by a hurricane in Orléans Parish, Louisiana. The work includes extensive excavation, replacement, CIPP lining of multiple pipe diameters, point‑repair services, lateral pipe replacement, new brick manhole construction, utility diversions, and full roadway, curb, sidewalk and asphalt restoration. Multiple vendors submitted proposals, with total line‑item values ranging from a few hundred dollars to multi‑million‑dollar totals, indicating a project budget on the order of $20 million.
• Major sewer‑main replacement (8″‑24″) and cured‑in‑place pipe (CIPP) lining across thousands of linear feet.
• Point‑repair, lateral replacement, and new brick manhole construction for both shallow and deep sections.
• Extensive right‑of‑way work: saw‑cut, removal, and reconstruction of reinforced‑concrete roads, asphalt surfaces, granite curbs, sidewalks, and driveways.
• Multiple vendors (Fleming Construction, BLD Services, BoH Brothers, BarrieRe Construction) competing on different trade packages.
• No award or submission deadline disclosed; the tabulation serves solely as a price comparison for the parish’s procurement office.