This project modernizes the below‑grade truck loading ramp (tunnel) at the Northeast Transfer Station to eliminate flooding during heavy rain. The contractor must provide all labor, materials, equipment, and tools to raise barrier walls, re‑grade the site, re‑route and replace storm‑water drainage, and upgrade pump and control‑panel systems. The work is fully funded, scheduled to start early September 2026, and must be completed within roughly four months, with off‑hours restrictions for tunnel work.
• Elevate tunnel entrances and the north retaining wall to stop storm‑water ingress.
• Re‑pipe interior storm‑water drains into the leachate system, replace drain covers, and abandon unused drains.
• Replace transfer pumps, relocate the control panel, repair concrete, re‑grade surrounding areas, and install debris screens.
• Provide all required permits, insurance, bonding, and E‑Verify compliance; perform off‑hours construction as required.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.