This contract awards Granite Construction Company the full civil‑construction scope for the Spring Creek Road Improvement Project – Phase 2, including associated improvements on South 48th Avenue and West Washington Avenue in Yakima, WA. The bid summary details a comprehensive set of line‑item works covering earthwork, utility installation, storm‑water structures, paving, concrete curb and sidewalk work, traffic control devices, illumination, erosion control, and site restoration. The project is split into two site services (Yakima and Richland) with a combined bid value of approximately $5.7 million. Key elements include:
• Mobilization, excavation, and backfilling of roadways and ditches (over 9,500 CY of earthwork).
• Installation of culvert pipes, catch basins, inlets, and related storm‑water infrastructure.
• Placement of crushed surfacing base and top courses, plus hot‑mix asphalt paving (several thousand tons).
• Comprehensive traffic‑control, signage, lighting, and signal systems for safe construction staging.
• Environmental protection measures such as fish exclusion, silt fences, mulching, seeding, and SWPPP compliance.