The City of Palm Bay is seeking a proposer to perform asphalt paving for approximately 5.0 linear miles of two-lane residential and collector roadways. The project includes a single final course over existing roadways, and tack coats will be required between any asphalt surfaces. The proposer must provide a price per ton, delivered and placed. The project must be completed prior to July 30, 2009.
• The project is for asphalt paving of 5.0 linear miles of roadways.
• The project includes a single final course over existing roadways.
• Tack coats will be required between any asphalt surfaces.
• The proposer must provide a price per ton, delivered and placed.
• The project must be completed prior to July 30, 2009.