Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Water and Wastewater
  5. ›Water Meter Test Bench - Water Department

Awarded contract·City of Spokane·Washington

Water Meter Test Bench - Water Department

Won by OW Investors LLC dba MARS Water$1MAwarded 4/23/2025Single Award
Contract source

Awarded vendors

  • OW Investors LLC dba MARS Water

Description

This contract provides a fully automated water‑meter test bench system for the City of Spokane’s Water Department. The scope includes design, fabrication, delivery, installation, and startup of two gravimetric test benches (one for small meters 5/8‑2 in., one for large meters 3‑10 in.), associated software, training, and a one‑year warranty. All required utilities (water, power, air, drain) are supplied by the City, while the vendor must provide a 2,500‑gal test tank for the large bench, spare parts for five years, and detailed O&M manuals. The award is a single‑award, lump‑sum ITB with the lowest responsive bidder selected. • Supply and install two AWWA‑compliant automated test benches (small & large). • Provide Enterprise Advanced Software Suite, training, O&M manuals, and one‑year warranty. • Deliver within four work weeks after award, with invoicing due within 30 days of completion.

Attached files

Key dates

Bids closed
2/10/2025
Intent to award
4/23/2025
Awarded
4/23/2025
Contract modified
2/3/2025
Starts
4/23/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
333618
Solicitation №
PW ITB 6258-24

Contract value

$1,000,000

The bid documents list an Engineer’s Estimate of $1,000,000.00, which is typically the budget ceiling for this type of equipment and installation. No other monetary values are disclosed, but given the scope (two fully automated benches, software, installation, training, warranty, and spare parts), a contract value near the $1 million estimate is realistic. Therefore a reasonable ball‑park figure is approximately one million U.S. dollars.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Massachusetts Town of Kingston·Massachusetts

Top match · 70%

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

City of Oshkosh·Wisconsin

70% match

IFB - REMOVAL/INSTALLATION OF TWO WATER METER TEST BENCHES WITH AMS TECHNOLOGY

Closes 11/10/2026Opened 10/16/2026

City of Bedford, TX·Texas

70% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

NYS Rockland County·New York

69% match

Flow Meter Inspection, Calibration and Testing Services

Closes 11/16/2026Opened 10/23/2026

LA Water & Power·California

69% match

146628 OWENS LAKE ABB WATERMASTER ELECTROMAGNETIC FLOW METERS

Closes 11/4/2026Opened 10/20/2026

Rural Community Water District of Georgetown County·South Carolina

68% match

Water Meter Pit Installation

Closes 11/23/2026Opened 10/27/2026

City of Charlotte·North Carolina

68% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

U.S. Department Of Defense·Massachusetts

67% match

Individual Water Treatment Device (IWTD) Laboratory Testing

Closes 11/12/2026Opened 10/8/2026

Arlington County Government·Virginia

67% match

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

City of Tampa·Florida

66% match

Mobile Water Bars

Closes 11/3/2026Opened 10/23/2026

U.S. Department Of Veterans Affairs·Washington

66% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026

City of Winnebago·Minnesota

66% match

Winnebago, City of Water Meter Replacement BMI Project No. 26X146003

Closes 11/18/2026Opened 10/25/2026

City of Holly Grove·Arkansas

66% match

City of Holly Grove Water System Improvements – Water Meter Replacement

Closes 11/18/2026Opened 10/25/2026

LA Water & Power·California

66% match

146747 5/8"-1", Meter, Cold Water, Positive Displacement

Closes 11/12/2026Opened 10/29/2026

Georgia Jones County Board of Commissioners·Georgia

66% match

Water Meter Change Out-2026

Closes 11/5/2026Opened 9/28/2026

Ohio Department of Rehabilitation and Correction·Ohio

66% match

Water Testing Services - CCI - DRC27

Closes 11/9/2026Opened 10/19/2026

City of Gould·Arkansas

66% match

RFP # 24RU40001 – Contract C – Water Meters

Closes 11/2/2026Opened 10/18/2026

Hilton Head Public Service District·South Carolina

66% match

Hilton Head Public Service District Meter Replacement RFQ

Closes 11/10/2026Opened 10/8/2026

Georgia City of Oxford·Georgia

66% match

City of Oxford Water and Electric Meter Replacement

Closes 11/4/2026Opened 9/29/2026

U.S. Department Of Veterans Affairs·Massachusetts

65% match

F109--Water Management Program and Chemical Testing Amendment 001- Q&A

Closes 11/6/2026Opened 10/8/2026

LA County Internal Services Department·California

65% match

WATER METERS HIGH PRESSURE 3 YEAR AGREEMENT

Closes 11/18/2026Opened 10/28/2026

Little Blue NRD·Nebraska

65% match

LBNRD Water Meter Replacements

Closes 12/3/2026Opened 10/23/2026

The Metropolitan Water District of Southern California·California

65% match

Furnish one hundred sixty (160) Chemical Flow Meters for the Metropolitan Water District Skinner Plant

Closes 12/7/2026Opened 10/26/2026

Connecticut Metropolitan District Commission·Connecticut

65% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

Florida Department of Corrections (FDC)·Florida

65% match

Laboratory Analysis on Water Treatment Plants, Wastewater Treatment Plants, and Groundwater Monitor

Closes 8/30/2027Opened 9/30/2026