Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Water Tank 9 Replacement Project

Awarded contract·City of La Porte·Texas

Water Tank 9 Replacement Project

Won by W.W. Payton Corp. +1 more$392kMultiple Award
Contract source

Awarded vendors

  • W.W. Payton Corp.
  • Gemini Contracting Services, Inc.

Description

The City of La Porte, Texas is replacing a 270,000-gallon bolted steel water storage tank at Water Plant #9. The project involves demolishing and removing the existing tank, erecting a new bolted steel tank, and connecting it to existing piping and valves. The contract was awarded to W.W. Payton Corp. and Gemini Contracting Services, Inc. with a total base bid of $375,000.00 and $408,000.00, respectively. The project is expected to be completed within 210 and 270 calendar days. Key aspects of the project include: • Demolition and removal of the existing tank • Erection of a new bolted steel tank • Connection to existing piping and valves • Completion within 210-270 calendar days • Awarded to W.W. Payton Corp. and Gemini Contracting Services, Inc.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
22001

Contract value

$391,500

Based on the bid tabulation document, the estimated value of the contract is between $375,000.00 and $408,000.00. This amount is derived from the total base bid of the two awarded vendors, W.W. Payton Corp. and Gemini Contracting Services, Inc. The actual value may vary depending on the final terms and conditions of the contract. Factors that may influence the contract value include the cost of materials, labor, and any potential addenda or changes to the project scope.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Eden Prairie Schools·Minnesota

Top match · 69%

Transportation Building Fuel Tanks Replacement

Closes 11/24/2026Opened 10/29/2026

U.P. Engineers & Architects, Inc·Michigan

69% match

Adams Township Water Tank

Closes 11/24/2026Opened 10/30/2026

City of Douglas WY·Wyoming

68% match

SWM #1 - Surge Tank Replacement Project

Closes 11/10/2026Opened 10/23/2026

U.S. Department Of Veterans Affairs·North Dakota

67% match

F109--Underground Diesel Storage Tank Boot Replacement , Fargo VA Healthcare System.

Closes 11/19/2026Opened 10/29/2026

City of Hanska·Minnesota

67% match

Hanska City 100,000‑Gallon Elevated Water Storage Tank Construction

Closes 11/23/2026Opened 10/23/2026

U.S. Department Of Justice·Illinois

67% match

Replace Water Tanks FCI Marion Marions, Illinois

Closes 11/30/2026Opened 10/29/2026

City of Holly Grove·Arkansas

66% match

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

DOC - Architecture and Engineering·Virginia

66% match

Greensville Recoating and Repairs to Water Tank 799-10887-1284

Closes 11/4/2026Opened 10/2/2026

Iowa Department of Transportation·Iowa

66% match

Maintenance and Repair of Iowa DOT Fuel Tank Systems (Districts 1-6)

Closes 11/18/2026Opened 10/28/2026

Riverton City·Utah

66% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

Massachusetts Town of Westborough·Massachusetts

65% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

Massachusetts Town of Hopkinton·Massachusetts

65% match

GROVE STREET TANK REHABILIATION

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of Defense·Mississippi

65% match

Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation

Closes 11/6/2026Opened 10/21/2026

City of Rosenberg·Texas

65% match

Water Plant No 4 - Recoat Elevated Storage Tank

Closes 11/19/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

65% match

15--TANK,FUEL,AIRCRAFT, IN REPAIR/MODIFICATION OF

Closes 11/15/2026Opened 9/30/2026

Stafford County·Virginia

65% match

Aquia Plant Aluminum Sulfate Tank Replacement

Closes 11/4/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

65% match

15--TANK,FUEL,AIRCRAFT, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/19/2026

Chennault International Airport Authority·Louisiana

65% match

Firewater Pumphouse #2 (FWPH) Firewater Storage Tanks 1 & 2 Repairs, Recoat, and Controls Upgrade (Project #2026-03)

Closes 11/17/2026Opened 10/13/2026

City of Douglas·Wyoming

65% match

SMW #1 Surge Tank Replacement Project

Closes 11/10/2026Opened 10/21/2026

City of Bellevue·Washington

65% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Charlotte·North Carolina

65% match

Elevated Water Tank Rehabilitation

Rolling / TBD closeOpened 1/12/2027

Nevada Adjutant General·Nevada

64% match

OTAG Water Heater Replacement

Closes 11/24/2026Opened 10/23/2026

California Grants·California

64% match

Replacing, Removing, or Upgrading Underground Storage Tanks Loan

Rolling / TBD closeOpened 1/30/2024

Pennsylvania PA State Sys of Higher Ed·Pennsylvania

64% match

Mihalik Thompson Stadium DHW Replacement

Closes 11/19/2026Opened 10/21/2026

City of Hollywood·Florida

64% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026