The City of La Porte, Texas is replacing a 270,000-gallon bolted steel water storage tank at Water Plant #9. The project involves demolishing and removing the existing tank, erecting a new bolted steel tank, and connecting it to existing piping and valves. The contract was awarded to W.W. Payton Corp. and Gemini Contracting Services, Inc. with a total base bid of $375,000.00 and $408,000.00, respectively. The project is expected to be completed within 210 and 270 calendar days. Key aspects of the project include:
• Demolition and removal of the existing tank
• Erection of a new bolted steel tank
• Connection to existing piping and valves
• Completion within 210-270 calendar days
• Awarded to W.W. Payton Corp. and Gemini Contracting Services, Inc.