The contract is for the construction of the Sacramento Regional County Sanitation District / Sacramento Power Authority / City of Sacramento Water Recycling Pipeline – Phase 1A. The project involves the installation of HDPE and DIP pipes via open cut construction and Horizontal Directional Drill (HDD). The estimated contract cost is $3,300,000.00. The contract was awarded to Garney Construction with a bid of $3,155,294.00.
• The project includes 231 feet of HDPE pipe and 1,169 feet of DIP pipe to be installed via open cut construction.
• The project also includes 3,210 feet of HDPE to be installed via HDD.
• The project includes 1,256 feet of HDPE pipe for the SSE pipeline to be installed via open cut and 3,210 feet of HDPE pipe to be installed via HDD.
• A mandatory pre-bid conference and walk-through were held for the purpose of reviewing and answering questions regarding this project.
• The contract was awarded based on the lowest bid received.