The contract is for the replacement of a Variable Message Sign (VMS) and walkway on the Northbound Mainline overhead sign structure at Mile Marker 30.35 and the fabrication and installation of a walkway on the Southbound Mainline overhead sign structure at Mile Marker 47.7. The work includes removing and replacing the VMS and walkway, fabricating and installing a new walkway, replacing damaged conduit and junction box, installing a VMS cabinet, powering and testing the new VMS sign, and maintenance of traffic. The contract is valued at approximately $500,000 to $1,000,000, based on the scope of work and industry standards. The contractor is responsible for completing the work by June 1, 2025.