The contract is for the replacement of kitchen flooring at the Wyoming Retirement Center. The project was awarded to Heart Mountain Construction, LLC, with a total bid of $215,779.00. The contract involves the replacement of kitchen flooring and requires the contractor to visit the site and familiarize themselves with the conditions affecting the work. A mandatory site visit was held on January 30, 2019, and bidders were required to sign an attendance sheet prior to the commencement of the pre-bid meeting.
• The contract requires the contractor to replace the kitchen flooring at the Wyoming Retirement Center.
• The project was awarded to Heart Mountain Construction, LLC, with a total bid of $215,779.00.
• The contract involves a mandatory site visit and requires the contractor to sign an attendance sheet prior to the commencement of the pre-bid meeting.
• The contractor must upload all bid response documents through the Public Purchase online bidding system.
• The contract has a bid bond requirement, and the contractor must submit a 10% bid bond or a 10% cashier check with their bid response.