Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kansas guideKansas Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Kansas
  4. ›Environmental Services
  5. ›Lime Residual Removal

Awarded contract·City of Olathe·Kansas

Lime Residual Removal

$325kSingle Award
Contract source

Description

The City of Olathe is seeking a contractor to provide lime residual removal and disposal from Water Plant Number 2. The work shall consist of providing all labor, materials, and equipment for excavation of lime residual from lime storing lagoon(s) including transporting to a predetermined location and burial of lime residual material. The contractor is to provide a base price to haul a single lagoon per year, and an optional price added for hauling a second lagoon of lime solids at the option of the City. The estimated lime residuals are 13,000 cubic yards per lagoon. • The contract is for lime residual removal and disposal from Water Plant Number 2. • The work includes excavation of lime residual from lime storing lagoon(s) and transporting to a predetermined location for burial. • The contractor must provide a base price to haul a single lagoon per year and an optional price for hauling a second lagoon. • The estimated lime residuals are 13,000 cubic yards per lagoon. • The contract is anticipated to begin by July 1 of each year, with completion expected to be 60 days after a notice to proceed, depending on weather and ground conditions.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Environmental Services
NAICS
562910
Solicitation №
13-4143

Contract value

$325,000

The value of the contract can be estimated based on the estimated lime residuals and the scope of work. Assuming an average cost of $10 per cubic yard of lime residuals, the total cost for removing 13,000 cubic yards per lagoon would be approximately $130,000 per lagoon. Since the contract includes an option for hauling a second lagoon, the total value of the contract could be around $260,000 to $390,000, depending on the number of lagoons and the actual cost per cubic yard. However, this is a rough estimate and the actual value of the contract may vary.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Renewable Water Resources·South Carolina

Top match · 62%

Lime Slurry Supply at Water Resource Recovery Facilities (WRRFs) and Pump Stations RFP 607

Closes 12/4/2026Opened 10/15/2026

City of Lime Springs·Iowa

61% match

Lime Springs, City of 100,000 Gallon Elevated Tower Reconditioning 26X.143612

Closes 11/19/2026Opened 10/29/2026

Wayne Township·New Jersey

60% match

High Calcium Hydrated Lime Ca(OH)2

Closes 11/13/2026Opened 10/21/2026

City of Hollywood·Florida

59% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

City of Springfield·Illinois

58% match

Removal & Beneficial Use of Synthetic Gypsum

Closes 11/12/2026Opened 10/20/2026

City of Hollywood·Florida

57% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

City of Santa Rosa·California

56% match

Secondary Clarifier No 1 Rehabilitation Project

Closes 11/10/2026Opened 9/29/2026

U.S. Department Of Energy·New Mexico

56% match

Ammonia-Assisted Regeneration for Longer-Lasting Direct Air Capture (DAC)

Closes 11/17/2026Opened 10/27/2026

City of Dunedin·Florida

56% match

HIGHLANDER POOL RESURFACING PROJECT

Closes 11/16/2026Opened 10/13/2026

City of Orange City·Florida

56% match

MAIN WATER TREATMENT PLANT GROUND STORAGE TANK PAINTING

Closes 12/3/2026Opened 10/25/2026

San Antonio Water System·Texas

56% match

1-Time Purchase of 54-inch Pipe Cleaning at Agua Vista WTP

Closes 11/5/2026Opened 10/15/2026

City of Mobile·Alabama

56% match

DISPOSAL SERVICE FOR BLOOD CONTAMINATED MEDICAL PRODUCTS, SUPPLIES, AND SHARPS

Closes 11/20/2026Opened 10/27/2026

City of Kyle·Texas

56% match

Yarrington Water Treatment Plant Disinfection Modification

Closes 12/1/2026Opened 10/26/2026

Town of Munster·Indiana

56% match

RFQ | Building Demolition and Site Restoration | 437 Ridge Road

Closes 11/18/2026Opened 10/16/2026

San Antonio Water System·Texas

55% match

1-Time Purchase of 54-inch Pipe Cleaning at Agua Vista WTP

Closes 11/5/2026Opened 10/15/2026

City of Ellsworth·Maine

55% match

Ellsworth City Seal Removal, Stabilization & Assessment

Closes 11/27/2026Opened 9/23/2026

City of Sulphur·Louisiana

55% match

ANNUAL SUPPLY OF LIMESTONE & ASPHALT

Closes 12/2/2026Opened 10/20/2026

San Antonio Water System·Texas

55% match

CHLR CALCIUM HYPOCHLORITE 100 LBS

Closes 11/1/2026Opened 10/22/2026

Palm Beach County Purchasing Department·Florida

55% match

PRESSURE CLEANING SERVICES, TERM CONTRACT

Closes 4/13/2031Opened 7/1/2026

City of Madison - Purchasing Services·Wisconsin

55% match

2027-2028 Ecological Restoration and Maintenance

Closes 11/2/2026Opened 9/29/2026

Texas Health & Human Services Commission·Texas

55% match

Boiler Installation / Demolition at Austin State Hospital (ASH)

Closes 11/2/2026Opened 10/9/2026

City of Madison·Wisconsin

55% match

Ecological Restoration and Maintenance

Closes 11/2/2026Opened 9/29/2026

City of Madison - Purchasing Services·Wisconsin

55% match

2027-2028 Ecological Restoration and Maintenance

Closes 11/3/2026Opened 10/6/2026

City of Columbia·South Carolina

55% match

Grounds Maintenance, Tree Removal, Turf Restoration & Debris Removal

Closes 11/6/2026Opened 10/6/2026

Board of County Commissioners, Palm Beach County·Florida

55% match

Prequalification - Annual Contract Demolition

Closes 3/3/2028Opened 7/24/2026