The contract is for the design and engineering of the Volucia Trail Sidewalk. The project involves the design and permitting of the sidewalk, with the contract term extending from June 6, 2024, to September 1, 2026, following two amendments. The contract was awarded to Engenuity Group, Inc. The key aspects of this contract include the design and engineering services, the contract term, and the amendments. Some of the key points to consider are:
• The contract term and amendments
• The design and engineering services provided by the vendor
• The budget and funding for the project
• The points-of-contact and their roles in the project