This contract concerns the complete replacement of the Brookside Road Wastewater Pump Station in Newington, Connecticut, including all associated equipment, accessories, permits, and related labor. The scope of work is detailed in Section 01010 of the bidding documents and requires a mandatory pre‑bid conference and site tour. The project is funded and overseen by The Metropolitan District, which managed the bid process from June 5 2023 through a July 17 2023 deadline, with the award announced on June 27 2024.
• Scope: Full demolition, removal, and installation of a new wastewater pump station with supporting civil and mechanical works.
• Location: 109 Brookside Road, Newington, CT (access via gated road from 81 Brookside Road).
• Procurement: Invited sealed bids (ITB) with a mandatory pre‑bid conference on June 15 2023.
Attached files
The award documents live at the source — open the contract source above to download them.